My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries, Inc. 5/3/2024
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Lakeside Industries, Inc. 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 8:35:52 AM
Creation date
5/3/2024 8:28:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries, Inc.
Approval Date
5/3/2024
Council Approval Date
5/8/2024
End Date
8/31/2024
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2024 Pavement Maintenance Overlay
Tracking Number
0004332
Total Compensation
$2,540,916.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2024 Pavement Maintenance Overlay SPECIAL PROVISIONS PW# 3823 2 in accordance with the attached Contract Plans, these Contract Provisions, and the Standard 1 Specifications. 2 3 1-01.3.RTF 4 1-01.3 Definitions 5 (January 19, 2022 APWA GSP) 6 7 Delete the heading Completion Dates and the three paragraphs that follow it, and replace 8 them with the following: 9 10 Dates 11 Bid Opening Date 12 The date on which the Contracting Agency publicly opens and reads the Bids. 13 Award Date 14 The date of the formal decision of the Contracting Agency to accept the lowest 15 responsible and responsive Bidder for the Work. 16 Contract Execution Date 17 The date the Contracting Agency officially binds the Agency to the Contract. 18 Notice to Proceed Date 19 The date stated in the Notice to Proceed on which the Contract time begins. 20 Substantial Completion Date 21 The day the Engineer determines the Contracting Agency has full and unrestricted 22 use and benefit of the facilities, both from the operational and safety standpoint, any 23 remaining traffic disruptions will be rare and brief, and only minor incidental work, 24 replacement of temporary substitute facilities, plant establishment periods, or 25 correction or repair remains for the Physical Completion of the total Contract. 26 Physical Completion Date 27 The day all of the Work is physically completed on the project. All documentation 28 required by the Contract and required by law does not necessarily need to be 29 furnished by the Contractor by this date. 30 Completion Date 31 The day all the Work specified in the Contract is completed and all the obligations of 32 the Contractor under the contract are fulfilled by the Contractor. All documentation 33 required by the Contract and required by law must be furnished by the Contractor 34 before establishment of this date. 35 Final Acceptance Date 36 The date on which the Contracting Agency accepts the Work as complete. 37 38 Supplement this Section with the following: 39 40 All references in the Standard Specifications or WSDOT General Special Provisions, to 41 the terms “Department of Transportation”, “Washington State Transportation 42 Commission”, “Commission”, “Secretary of Transportation”, “Secretary”, “Headquarters”, 43 and “State Treasurer” shall be revised to read “Contracting Agency”. 44 45 All references to the terms “State” or “state” shall be revised to read “Contracting 46 Agency” unless the reference is to an administrative agency of the State of Washington, 47 a State statute or regulation, or the context reasonably indicates otherwise. 48 49
The URL can be used to link to this page
Your browser does not support the video tag.