Laserfiche WebLink
2024 Pavement Maintenance Overlay SPECIAL PROVISIONS PW# 3823 3 All references to “State Materials Laboratory” shall be revised to read “Contracting 1 Agency designated location”. 2 3 All references to “final contract voucher certification” shall be interpreted to mean the 4 Contracting Agency form(s) by which final payment is authorized, and final completion 5 and acceptance granted. 6 7 Additive 8 A supplemental unit of work or group of bid items, identified separately in the Bid 9 Proposal, which may, at the discretion of the Contracting Agency, be awarded in addition 10 to the base bid. 11 12 Alternate 13 One of two or more units of work or groups of bid items, identified separately in the Bid 14 Proposal, from which the Contracting Agency may make a choice between different 15 methods or material of construction for performing the same work. 16 17 Business Day 18 A business day is any day from Monday through Friday except holidays as listed in 19 Section 1-08.5. 20 21 Contract Bond 22 The definition in the Standard Specifications for “Contract Bond” applies to whatever 23 bond form(s) are required by the Contract Documents, which may be a combination of a 24 Payment Bond and a Performance Bond. 25 26 Contract Documents 27 See definition for “Contract”. 28 29 Contract Time 30 The period of time established by the terms and conditions of the Contract within which 31 the Work must be physically completed. 32 33 Notice of Award 34 The written notice from the Contracting Agency to the successful Bidder signifying the 35 Contracting Agency’s acceptance of the Bid Proposal. 36 37 Notice to Proceed 38 The written notice from the Contracting Agency or Engineer to the Contractor authorizing 39 and directing the Contractor to proceed with the Work and establishing the date on which 40 the Contract time begins. 41 42 Traffic 43 Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, and 44 equestrian traffic. 45