Laserfiche WebLink
2024 Pavement Maintenance Overlay SPECIAL PROVISIONS PW# 3823 72 8-09.4 Measurement 1 2 Section 8-09.4 is supplemented with the following: 3 4 Measurement of markers will be per hundred for markers furnished and in place. 5 6 8-09.5 Payment 7 8 Section 8-09.5 is supplemented with the following: 9 10 Payment will be made in accordance with section 1-04.1, for the following Bid item 11 included in the Proposal: 12 13 “Raised Pavement Marker Type 2”, per hundred. 14 15 16 GLF 8-13.DOCX 17 8-13 MONUMENT CASES 18 19 Section 8-13 of the standard specifications is deleted and replaced by the following: 20 21 (******) 22 8-13.1 Description 23 24 This work will consist of adjusting existing survey monument cases to grade in 25 accordance with Standard Drawing No. 323 and these Special Provisions. 26 27 8-13.2 Vacant 28 29 8-13.3 Construction Requirements 30 31 Existing monument castings shall be adjusted to grade in the same manner as for 32 manholes in Section 7-05.3(1) of these Special Provisions. 33 34 8-13.4 Measurement 35 36 Measurement of monument case and cover will be by the unit for each monument case 37 and cover adjusted to grade. 38 39 8-13.5 Payment 40 41 Payment will be made for the following bid items when included in the proposal: 42 43 "Adjust Existing Monument Castings to Grade," per each; 44 45 The unit contract price for "Adjust Existing Monument Casing to Grade" shall include all 46 costs to adjust the casting to finished grade. 47 48 49