My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-102 <br />Examples of Construction Contractor and CPL responsibilities and interaction include, but <br />are not limited to, the following: <br />• CPL shall provide timely and regular communications with the City, residents, <br />business/institution owners, and managers and any other persons affected by the <br />construction to inform them of the status of scheduled work activities as needed. <br />• If a complaint, question or issue should arise from the public (a resident, motorist, <br />business owner etc.), that requires action by the Water Main Replacement “Y” <br />project construction team, the CPL shall communicate that information to the <br />Construction Manager and otherwise interface as needed between the public and <br />the contractor to assure that the issue is resolved promptly. <br />• CPL and the City’s inspector and construction manager shall attempt to contact or <br />otherwise meet with each individual business/institution owner or manager and <br />affected residents to identify specific concerns in advance of construction and to <br />promptly address specific needs during construction. <br />• City’s Public Works Information & Education Officer, in coordination with the CPL, <br />shall provide notices of impending temporary closures of streets, alleys or driveways <br />that are otherwise used for access to parking lots or buildings along the area of <br />work. The text and information contained on any notices shall be jointly prepared by <br />the Construction Manager and the CPL. <br />• Contractor, in coordination with the CPL, shall provide notices to business/institution <br />owners and managers and/or affected residents of temporary shutdown of utilities. <br />The text and information contained on any notices shall be jointly prepared by the <br />Construction Manager and the CPL. <br />• Contractor and CPL shall provide assistance to business/institution owners and <br />managers and/or affected residents to minimize and mitigate impacts during <br />construction, including but not limited to; mail and package delivery, garbage and <br />recycling pickup, freight delivery, handicap parking and access, customer/patient <br />access and parking etc. <br />• Contractor and CPL will coordinate to ensure the needs of the community are <br />incorporated into the contractor’s construction schedule and timely updates <br />furnished to the public. Contractor and CPL shall coordinate with the City during <br />special events. <br />• CPL shall have phone numbers with 24-hour telephone message capability for <br />business/institution owners and managers and/or affected residents to request <br />assistance or information regarding issues related to the construction project. <br />• CPL will maintain a written log of all communications with businesses, institutions or <br />residents that involve complaints or issues requiring response or action by the City <br />or the construction contractor. This log will be made available for review by the <br />Owner’s Representative upon request. <br />
The URL can be used to link to this page
Your browser does not support the video tag.