My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-111 <br />Evergreen Way and 52nd Street Site: <br />• Only night work allowed for waterline construction <br />• Only one lane closure in each direction permitted between the hours of 11:00 am <br />to 6:00 pm. <br />Beverly Lane: <br />• Night work is not permitted <br />• No full block street closures are allowed <br />Evergreen Way and 75th Street Site <br />• Only night work allowed for waterline construction and roadwork <br />• Only one lane closure in each direction permitted between the hours of 11:00 am <br />to 6:00 pm. <br />Upon completion of pipe installation and trench backfilling to specifications, promptly <br />restore street, driveway and sidewalk surfaces using Temporary Pavement Patch in <br />accordance with Section 5-06.3(6) TEMPORARY ROADWAY SURFACING and permit <br />public use and access for City inspection activities. <br />Parking spaces are normally very limited in most areas of the project and the <br />Contractor will be required to cooperate with the City in resolving parking issues. In <br />general, businesses and residents who rely on on-street parking and are displaced by <br />the construction shall be given priority for the nearest available parking location. The <br />Contractor’s employees may be required to park their personal vehicles away from the <br />area of construction. <br />This 1-8.4(2) is not a complete list of all constraints that may be in the Contract <br />Documents. Contractor is responsible for all constraints in the Contract Documents. <br />1-08.5 Time for Completion <br />Delete all of 1-08.5 and substitute the following: <br /> <br />This project shall be physically completed within 140 working days. <br /> <br />1-08.5(1) General <br />The Contractor shall complete all physical Contract Work within the number of <br />“working days” stated in the Contract Provisions or as extended by the Engineer in <br />accordance with Section 1-08.8. Every day will be counted as a “working day” unless it <br />is a nonworking day or an Engineer determined unworkable day. A nonworking day is <br />defined as a Saturday, a Sunday, a whole or half day on which the Contract specifically <br />prohibits Work on the critical path of the Contractor’s approved progress schedule, or <br />one of these holidays: January 1, the third Monday of January, the third Monday of <br />February, Memorial Day, June 19, July 4, Labor Day, November 11, Thanksgiving Day, <br />the day after Thanksgiving, and Christmas Day. When any of these holidays fall on a <br />Sunday, the following Monday shall be counted a nonworking day. When the holiday <br />falls on a Saturday, the preceding Friday shall be counted a nonworking day. The days <br />between December 25 and January 1 will be classified as nonworking days. <br />An unworkable day is defined as a half or whole day the Engineer declares to be <br />unworkable because of weather or conditions caused by the weather that prevents <br />satisfactory and timely performance of the Work shown on the critical path of the <br />Contractor’s approved progress schedule. Other conditions beyond the control of the <br />Contractor may qualify for an extension of time in accordance with Section 1-08.8. <br />Contract Time shall begin on the effective date of the Notice to Proceed. The Contract <br />Documents may specify another starting date for Contract Time, in which case, <br />Contract Time will begin on the starting date the Contract Documents specify.
The URL can be used to link to this page
Your browser does not support the video tag.