CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-111 <br />Evergreen Way and 52nd Street Site: <br />• Only night work allowed for waterline construction <br />• Only one lane closure in each direction permitted between the hours of 11:00 am <br />to 6:00 pm. <br />Beverly Lane: <br />• Night work is not permitted <br />• No full block street closures are allowed <br />Evergreen Way and 75th Street Site <br />• Only night work allowed for waterline construction and roadwork <br />• Only one lane closure in each direction permitted between the hours of 11:00 am <br />to 6:00 pm. <br />Upon completion of pipe installation and trench backfilling to specifications, promptly <br />restore street, driveway and sidewalk surfaces using Temporary Pavement Patch in <br />accordance with Section 5-06.3(6) TEMPORARY ROADWAY SURFACING and permit <br />public use and access for City inspection activities. <br />Parking spaces are normally very limited in most areas of the project and the <br />Contractor will be required to cooperate with the City in resolving parking issues. In <br />general, businesses and residents who rely on on-street parking and are displaced by <br />the construction shall be given priority for the nearest available parking location. The <br />Contractor’s employees may be required to park their personal vehicles away from the <br />area of construction. <br />This 1-8.4(2) is not a complete list of all constraints that may be in the Contract <br />Documents. Contractor is responsible for all constraints in the Contract Documents. <br />1-08.5 Time for Completion <br />Delete all of 1-08.5 and substitute the following: <br /> <br />This project shall be physically completed within 140 working days. <br /> <br />1-08.5(1) General <br />The Contractor shall complete all physical Contract Work within the number of <br />“working days” stated in the Contract Provisions or as extended by the Engineer in <br />accordance with Section 1-08.8. Every day will be counted as a “working day” unless it <br />is a nonworking day or an Engineer determined unworkable day. A nonworking day is <br />defined as a Saturday, a Sunday, a whole or half day on which the Contract specifically <br />prohibits Work on the critical path of the Contractor’s approved progress schedule, or <br />one of these holidays: January 1, the third Monday of January, the third Monday of <br />February, Memorial Day, June 19, July 4, Labor Day, November 11, Thanksgiving Day, <br />the day after Thanksgiving, and Christmas Day. When any of these holidays fall on a <br />Sunday, the following Monday shall be counted a nonworking day. When the holiday <br />falls on a Saturday, the preceding Friday shall be counted a nonworking day. The days <br />between December 25 and January 1 will be classified as nonworking days. <br />An unworkable day is defined as a half or whole day the Engineer declares to be <br />unworkable because of weather or conditions caused by the weather that prevents <br />satisfactory and timely performance of the Work shown on the critical path of the <br />Contractor’s approved progress schedule. Other conditions beyond the control of the <br />Contractor may qualify for an extension of time in accordance with Section 1-08.8. <br />Contract Time shall begin on the effective date of the Notice to Proceed. The Contract <br />Documents may specify another starting date for Contract Time, in which case, <br />Contract Time will begin on the starting date the Contract Documents specify.