Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-110 <br />The City may issue partial Notices to Proceed. Contractor may seek permission in writing to <br />perform some Work prior to issuance to the Notice to Proceed, such as shop drawings, <br />equipment and material Submittals, or surveying and the City or City’s Representative may, <br />in its sole discretion, approve in writing such Work prior to the issuance of the Notice to <br />Proceed. <br />Supplement 1-08.4 by adding the following: <br />1-08.4(1) Construction Progress <br />(******) <br />The Contractor shall furnish all labor, materials, facilities and Equipment necessary to <br />ensure the prosecution and completion of the Project within the interim milestones, <br />Substantial Completion, Physical Completion and Completion Dates of the Contract. If <br />Work falls seven calendar days or more behind the reviewed Preliminary Schedule, the <br />Contractor agrees that, at its sole cost and expense, it will take all actions necessary to <br />return the Project to the accepted schedule. These actions may include the following: <br />a. Increase labor in quantities and crafts. <br />b. Increase the number of working hours per shift, shifts per working day, <br />working days per week, or the amount of Equipment, or any combination of <br />the foregoing. <br />c. Reschedule activities. <br />If requested by the City’s Representative, the Contractor shall prepare a proposed <br />schedule revision demonstrating a plan to make up the lag in progress and insure <br />completion of the Work within the Contract Time. All actions taken to return the Project <br />to the accepted schedule are at the Contractor's expense. <br />The Contractor shall pay all costs incurred by the City that result from the Contractor's <br />action to return the Project to its accepted schedule, including, but not limited to, <br />additional, overtime, or third party inspection, design and construction management <br />service costs. Contractor agrees that City shall deduct such charges from payments <br />due the Contractor. It is further understood and agreed that none of the services <br />performed by the City’s Representative in monitoring, reviewing and reporting Project <br />status and progress shall relieve the Contractor of responsibility for planning and <br />managing construction Work in conformance with the construction schedule. <br />1-08.4(2) Special Construction Constraints <br />(******) <br />Refer to 1-08.0(2) for work hours. <br />Refer to 1-07.23(1) for construction under traffic and 1.07.23(1)A for general traffic <br />requirements. <br />Provide notice in accordance with 8-20.3(1) of these Special Provisions to City of <br />Everett Traffic Department before cutting induction loop wiring. <br />Pay particular attention to maximum length allowed between sampling points on new <br />water main in accordance with 7-09.3(24)H FINAL FLUSHING AND TESTING. <br />Madrona Avenue Site: <br />• Night work is not permitted <br />• No work will be allowed in W Mukilteo Blvd from 2:00 p.m. to 6:00 p.m. <br />• Trench box required for excavation on all waterline installation <br />• The length of trench excavation is limited to 80 feet maximum between Sta. 23+00 <br />to 31+00 <br />• Waterline construction work shall be completed before September 15th, 2024 <br />• A detailed survey and monitoring program should be implemented prior to and <br />during construction to observe settlement and lateral movement in the streets