CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-110 <br />The City may issue partial Notices to Proceed. Contractor may seek permission in writing to <br />perform some Work prior to issuance to the Notice to Proceed, such as shop drawings, <br />equipment and material Submittals, or surveying and the City or City’s Representative may, <br />in its sole discretion, approve in writing such Work prior to the issuance of the Notice to <br />Proceed. <br />Supplement 1-08.4 by adding the following: <br />1-08.4(1) Construction Progress <br />(******) <br />The Contractor shall furnish all labor, materials, facilities and Equipment necessary to <br />ensure the prosecution and completion of the Project within the interim milestones, <br />Substantial Completion, Physical Completion and Completion Dates of the Contract. If <br />Work falls seven calendar days or more behind the reviewed Preliminary Schedule, the <br />Contractor agrees that, at its sole cost and expense, it will take all actions necessary to <br />return the Project to the accepted schedule. These actions may include the following: <br />a. Increase labor in quantities and crafts. <br />b. Increase the number of working hours per shift, shifts per working day, <br />working days per week, or the amount of Equipment, or any combination of <br />the foregoing. <br />c. Reschedule activities. <br />If requested by the City’s Representative, the Contractor shall prepare a proposed <br />schedule revision demonstrating a plan to make up the lag in progress and insure <br />completion of the Work within the Contract Time. All actions taken to return the Project <br />to the accepted schedule are at the Contractor's expense. <br />The Contractor shall pay all costs incurred by the City that result from the Contractor's <br />action to return the Project to its accepted schedule, including, but not limited to, <br />additional, overtime, or third party inspection, design and construction management <br />service costs. Contractor agrees that City shall deduct such charges from payments <br />due the Contractor. It is further understood and agreed that none of the services <br />performed by the City’s Representative in monitoring, reviewing and reporting Project <br />status and progress shall relieve the Contractor of responsibility for planning and <br />managing construction Work in conformance with the construction schedule. <br />1-08.4(2) Special Construction Constraints <br />(******) <br />Refer to 1-08.0(2) for work hours. <br />Refer to 1-07.23(1) for construction under traffic and 1.07.23(1)A for general traffic <br />requirements. <br />Provide notice in accordance with 8-20.3(1) of these Special Provisions to City of <br />Everett Traffic Department before cutting induction loop wiring. <br />Pay particular attention to maximum length allowed between sampling points on new <br />water main in accordance with 7-09.3(24)H FINAL FLUSHING AND TESTING. <br />Madrona Avenue Site: <br />• Night work is not permitted <br />• No work will be allowed in W Mukilteo Blvd from 2:00 p.m. to 6:00 p.m. <br />• Trench box required for excavation on all waterline installation <br />• The length of trench excavation is limited to 80 feet maximum between Sta. 23+00 <br />to 31+00 <br />• Waterline construction work shall be completed before September 15th, 2024 <br />• A detailed survey and monitoring program should be implemented prior to and <br />during construction to observe settlement and lateral movement in the streets