My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-115 <br />1-08.7 Maintenance During Suspension <br />Delete all of 1-08.7 and substitute the following: <br />Before and during any suspension (as described in Section 1-08.6) the Contractor shall <br />protect the Work from damage or deterioration. Suspension shall not relieve the <br />Contractor from anything the Contract requires unless this Section states otherwise. <br />At no expense to the City, the Contractor shall provide through the construction area a <br />safe, smooth, and unobstructed roadway, sidewalk, and path for public use during <br />suspension, as required in 1-07.23 PUBLIC CONVENIENCE AND SAFETY. This may <br />require a temporary road or detour. <br />If the Engineer determines that the Contractor failed to pursue the Work diligently before <br />the suspension, or failed to comply with the Contract or orders, then the Contractor shall <br />maintain the temporary roadway, sidewalk, and path in use during suspension. In this <br />case, the Contractor shall bear the maintenance costs. If the Contractor fails to maintain <br />the temporary roadway, sidewalk, and path the City will do the Work and deduct all <br />resulting costs from payments due to the Contractor. <br />If the Engineer determines that the Contractor has pursued the Work diligently before <br />the suspension, then the City will maintain the temporary roadway, sidewalk, and path <br />(and bear its cost). This City-provided maintenance work will include only routine <br />maintenance of: <br />1. The Traveled Way, Auxiliary Lanes, Shoulders, detour surface, sidewalks, and <br />paths, <br />2. Roadway drainage along and under the traveled Roadway, sidewalk, path or <br />detour, and <br />3. All barricades, signs, and lights needed for directing traffic through the <br />temporary Roadway, sidewalk, path or detour in the construction area. <br />The Contractor shall protect and maintain all other Work in areas not used by traffic. All <br />costs associated with protecting and maintaining such Work shall be the responsibility of <br />the Contractor except those costs associated with implementing the TESC Plan <br />according to Section 8-01. <br />After suspension during which the City has done the routine maintenance, the <br />Contractor shall accept the traveled Roadway, sidewalk, path or detour as is when Work <br />resumes. The Contractor shall make no claim against the City for the condition of the <br />Roadway or detour. <br />After any suspension, the Contractor shall resume all responsibilities the Contract <br />assigns for the Work. <br />1-08.8 Extensions of Time <br />Delete the second paragraph of 1-08.8 and replace with: <br />In evaluating requests for time extension, the Engineer will consider how well the <br />Contractor used the time from Contract execution up to the point of the delay and the <br />effect the delay had on any completion times included in the Special Provisions. The <br />Engineer will evaluate and issue a Written Determination. <br />Delete the final two sentences of 1-08.8 and replace with: <br />If the Contractor does not agree with the Engineer’s Written Determination, the <br />Contractor shall provide Notice in accordance with Section 1-04.5. By failing to follow the <br />procedures of Section 1-04.5 and Section 1-9.11, the Contractor completely waives <br />claims for protested Work. <br />Supplement 1-08.8 by adding the following: <br />Any requests for extensions in Contract Time, whether resulting from Extra Work <br />directed by the City or not, shall be accompanied by an analysis of schedules using the