My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-116 <br />critical path method. This analysis shall include an updated schedule, an as-planned <br />schedule, an as-built schedule, a but-for schedule, and narrative explaining the alleged <br />causes, schedule impacts and all costs related to or arising out of the proposed <br />extension. Any requests for extensions of Contract Time by the Contractor shall be <br />submitted in accordance with these Contract Documents. If a request combined with <br />previous extension requests, equals 20 percent or more of the original Contract Time <br />then the Contractor’s letter of request must bear consent of Surety if so required by the <br />City. Extensions of Contract Time will be granted only as provided in the Contract <br />Documents and to the extent that affected critical activities exceed the Total Float time <br />along the affected paths of the reviewed Preliminary Schedule at the time the change <br />was authorized in writing by the City. Contractor has the burden of clearly and <br />convincingly demonstrating entitlement to any adjustment of Contract Time. <br />If the City is solely responsible for any Delay to Substantial Completion, Physical <br />Completion, Completion Date, or Final Acceptance, the Contractor shall only be entitled <br />to compensation or other damages as described in 1-09.11A REMEDIES, provided that <br />Contractor timely gave Notice pursuant to 1-04.5 NOTICE BY CONTRACTOR, timely <br />submitted a Contract Claim pursuant to 1-09.11(2) CONTRACT CLAIMS and fulfilled the <br />requirements of 1-08.3 PROGRESS SCHEDULE. <br />1-08.9 Liquidated Damages <br />Revise the second and third paragraphs of 1-08.9 to read as follows: <br /> <br />Accordingly, the Contractor agrees: <br />1. To pay (according to the following formula) liquidated damages for each <br />working day beyond the number of working days established for Physical <br />Completion, and <br />2. To authorize the Engineer to deduct these liquidated damages from any <br />money due or coming due to the Contractor. <br /> <br />Liquidated Damages Formula <br /> <br />LD=0.15C/T <br /> <br />Where: <br /> LD = liquidated damages per working day (rounded to the nearest dollar) <br /> C = original Contract amount <br /> T = original time for Physical Completion <br />When the Contract Work has progressed to Substantial Completion as defined in the <br />Contract, the Engineer may determine that the work is Substantially Complete. The <br />Engineer will notify the Contractor in writing of the Substantial Completion Date. For <br />overruns in Contract time occurring after the date so established, the formula for <br />liquidated damages shown above will not apply. For overruns in Contract time <br />occurring after the Substantial Completion Date, liquidated damages shall be assessed <br />on the basis of direct engineering and related costs assignable to the project until the <br />actual Physical Completion Date of all the Contract Work. The Contractor shall <br />complete the remaining Work as promptly as possible. Upon request by the Project <br />Engineer, the Contractor shall furnish a written schedule for completing the physical <br />Work on the Contract.
The URL can be used to link to this page
Your browser does not support the video tag.