My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-121 <br />e. Any changes in centerline profile and curb & gutter (top of curb), offsets and <br />elevations. <br />f. Details, Equipment or materials used that were not shown on the original <br />Plans. <br />g. The actual arrangement and routing of conduit, embedded conduit, raceways <br />and piping relative to its location and proportioned to other work. The location <br />needs to be dimensioned on the record drawings. <br />h. Contractor prepared piping schematics and diagram drawings representing <br />the Equipment orientation. <br />i. Final location of all surface and subsurface improvements. <br />j. Record on the drawings the location of all field run materials. <br />k. All shoring systems left in place at the end of construction. <br />Contractor shall accurately show existing underground items including, but not limited <br />to, piping, manholes, pull boxes, conduit, direct buried wire, foundations, equipment <br />and obstructions found during construction on the record drawings. Note on the record <br />drawings the actual size of all utilities and structures and types of material used. <br />Locate all record drawing items by survey coordinates or dimensioned off NAD 83 -91 <br />for Horizontal Datum and NAVD 88 for Vertical Datum. Minimum requirements for <br />accuracy are specified in the following chart. <br /> <br />Description Horizontal <br />Location <br />Elevation Notes <br />Gravity sewer and <br />drain lines <br />Coordinates, <br />stations, and <br />offsets 0.1 ft. <br />I.E. 0.01 ft. Recalculate actual slopes. <br />All inverts in manholes. <br />All angle changes. <br />Forcemains, <br />watermains and <br />transmission lines <br />Coordinates <br />and stations 0.1 <br />ft. <br />I.E. 0.1 ft. Record all angle points and <br />finished ground elev. Above <br />the invert elev. <br />All other items, incl. <br />Electrical and <br />Structural <br />0.1 ft. 0.1 ft. Show dimensions on record <br />drawings. <br /> <br />Use red pen or pencil to make changes on the record drawings. Notations are to be <br />neat, legible, clear and concise. <br />Record information concurrently with the progress of construction. Conceal no work <br />until the required information is verified and recorded. <br />1-08.11(3) Payment <br />Payment for Bid items of Work completed pursuant to the Contract Documents will be <br />as described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT <br />AND PAYMENT of the Standard Specifications. <br />1-09 MEASUREMENT AND PAYMENT <br />1-09.1 Measurement of Quantities <br />Supplement 1-09.1 by adding the following: <br />Measurement by the Ton: Where items are specified to be paid for by the ton it will be <br />the Contractor's responsibility to see that a certified weight ticket is given to the City’s <br />Inspector on the Project at the time of delivery of materials for each truckload <br />delivered. Pay quantities will be prepared on the basis of certified weight tickets <br />delivered to the City’s Inspector at time of delivery of materials. Tickets not received by <br />the City’s Inspector on day of delivery will not be honored for payment.
The URL can be used to link to this page
Your browser does not support the video tag.