My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-123 <br />inefficiency, impact and ripple costs causing, arising out of, or relating to such <br />Delays or extension. <br />4. Contractor and City agree that compensation to the Contractor for a Contract <br />Claim shall not exceed the Contractor’s costs based upon Force Account as <br />described in 1-09.6 FORCE ACCOUNT. Contractor waives, releases, and <br />agrees not to submit any request for adjustment of Contract Sum or Contract <br />Claim based upon a “total cost” or “modified total cost” calculation, in whole or <br />in part, but instead agrees that any and all requests for compensation shall be <br />based upon accurate, complete and contemporaneous cost records that <br />segregate and allocate costs (a) between base Contract work and the Work <br />for which additional compensation is sought and (b) between each item of <br />Work for which additional compensation is sought. Claims for inefficiency <br />shall only be based and calculated by a comparison of productivity of similar <br />Work performed in an unaffected or least affected area of the Project. <br />5. No claim for consequential damages of any kind will be allowed. <br />1-09.4(2) Unabsorbed and Extended Overhead <br />(******) <br />Any Extended or Unabsorbed Overhead to which the Contractor may be entitled shall <br />be calculated using the Eichleay formula by: <br />1. Determining the pro-rata amount of Overhead allocable to the subject project. <br />This is accomplished by multiplying Overhead costs by the ratio of the subject <br />project’s billings to the Contractor’s overall billings during the overall period of <br />the subject Project’s performance. The result is “Allocable Overhead.” Any <br />additional and unresolved direct cost claims presented by the Contractor <br />concurrently with any request for Extended and/or Unabsorbed Overhead <br />shall not be included in determining the ratio of the subject Project billings to <br />overall Contractor billings for the period of project performance. <br />2. Determining the daily amount of Allocable Overhead for the subject Project. <br />This is accomplished by dividing the Allocable Overhead for the subject <br />Project by the number of days, (as contractually defined) of Contract <br />performance. The result is the Daily Rate of Allocable Overhead. <br />3. Determining the gross amount of potential additional compensation for Home <br />Office Overhead due to the project extension. This is accomplished by <br />multiplying the Daily Rate of Allocable Overhead by the number of days of <br />project extension caused solely by the City. This results in the Gross Amount <br />of Additional Home Office Overhead Compensation. <br />4. Adjusting the Gross Amount of Additional Home Office Overhead <br />Compensation for any additional contribution for Overhead received by the <br />Contractor on any Change Orders that are being presented and resolved <br />concurrently with the subject calculation for Unabsorbed and/or Extended <br />Home Office Overhead. The necessary adjustment would be to reduce the <br />Gross Amount of Additional Home Office Overhead Compensation by any <br />additional compensation for Overhead included in any direct cost claims <br />being resolved concurrently with any claim for Extended and/or Unabsorbed <br />Home Office Overhead. <br />Contractor shall not receive compensation for cost of use of equity capital. <br />Supplement 1-09.4 by adding the following: <br />1-09.4(3) COVID-19 Equitable Adjustments <br />Contractor’s Bid includes all costs necessary for the duration of the Work for <br />compliance with COVID-19 Requirements. Contractor’s Bid takes into account that
The URL can be used to link to this page
Your browser does not support the video tag.