My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-124 <br />COVID-19 Requirements may create direct and indirect costs, including inefficiency and <br />Delay. <br />Contractor shall have no entitlement to an equitable adjustment or other increase to the <br />Contract Sum for any direct or indirect costs (including without limitation Delay, <br />cumulative impact, inefficiency or ripple costs) incurred by the Contractor to comply with <br />the COVID-19 Requirements. <br />1-09.5 Deleted or Terminated Work <br />Delete the first paragraph, beginning with “The Engineer may delete,” and the second <br />paragraph, beginning with “Payment for completed items,” and substitute the following: <br />The City’s Representative may delete Work as provided in 1-04.4 CHANGES or may <br />terminate the Contract in whole or part as provided in 1-08.10(2) TERMINATION FOR <br />PUBLIC CONVENIENCE. When the Contract is partially terminated for the City’s <br />convenience, the partial termination shall be treated as a deductive Change Order for <br />payment purposes under this section. <br />Payment for completed items will be at contract unit prices or pursuant to the Schedule <br />of Values. <br />Delete the fourth paragraph, beginning with “Contract time shall be,” and the fifth <br />paragraph, beginning with “Acceptable materials ordered by,” and substitute the following: <br />Acceptable materials ordered by the Contractor prior to the date the Work was <br />terminated or deleted will either be purchased from the Contractor by the City at the <br />actual cost and shall become the property of the City, or the City will reimburse the <br />Contractor for the actual costs of returning these materials to the suppliers. <br />If Contractor disagrees with the adjustment of Contract Sum determined by the City’s <br />Representative, Contractor may submit a Contract Claim for the difference between <br />the amount determined by the City’s Representative and the amount sought by the <br />Contractor. <br />Contractor shall not be entitled to any anticipated profits on deleted, terminated, or <br />uncompleted Work. <br />1-09.6 Force Account <br />Supplement 1-09.6 by adding the following: <br />The City has estimated and included in the Proposal dollar amounts for all items to be <br />paid per Force Account. This is done only to provide a common Bid for Bidders. All <br />such dollar amounts are to become a part of Contractor's total bid. However, the City <br />does not warrant expressly or by implication that the actual amount of Work will <br />correspond with those estimates. Payment will be made on the basis of the amount of <br />Work actually authorized by Engineer. <br />1-09.7 Mobilization <br />Supplement 1-09.7 by adding the following: <br />1. Construction Identification Signs: Upon commencement of Work, the Contractor <br />shall furnish and erect two Project/Construction Identification Signs in accordance <br />with COE Standard Drawing No. 714, one at each end of each work area at <br />Engineer approved locations. <br />a. Contractor shall provide sign painting, lettering and detailing by a professional <br />sign maker with Engineer approval prior to placement on job site. <br />b. Contractor shall provide a Project Information Sign for each of the two <br />Project/Construction Identification Signs. Attach Project Information Sign to <br />the surface of the sign face in accordance with COE Standard Plan No. 714. <br />The Construction Identification Sign shall contain the following three lines of <br />information that the Engineer will provide:
The URL can be used to link to this page
Your browser does not support the video tag.