Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-126 <br />Plans and Specifications and that the materials or Equipment for which payment is <br />requested reasonably conform to the Specifications and are either on the job site or <br />have been installed. If requested by the City’s Representative, provide additional data <br />as may be reasonably required to support the payment estimate. Additional data may <br />include, but not be limited to, satisfactory evidence of payment for Equipment, <br />materials and labor, including payments to Subcontractors and suppliers. Certified <br />invoices by the suppliers shall accompany a request for payment for delivered <br />Equipment and material. Such Equipment and material shall be suitably and safely <br />stored at the site of the Work. Payment requests shall summarize accepted operating <br />and maintenance material with request for Equipment payment. <br />A progress payment is preliminary only. By making a progress payment, the City does <br />not waive or release its right, nor is it estopped from asserting, that previous progress <br />payments were not earned or were in error, whether in whole or in part. <br />1.09.9(2) Review Procedures <br />The City’s Representative will review the estimate and either indicate in writing to the <br />City his or her concurrence with the estimate and his or her recommendation that <br />payment be made, or indicate in writing to the Contractor his or her reasons for not <br />concurring with the estimate. If the City’s Representative recommends payment and <br />the City concurs, the City will pay the Contractor a progress payment on the basis of <br />the approved partial payment estimate, less retainage and any amounts the City may <br />withhold pursuant to Contract or law. The recommendation of the City’s Representative <br />is not conclusive, final or binding upon the City. <br />In the event the City’s Representative does not concur with the estimate, the <br />Contractor may make the changes necessary to obtain the City’s Representative's <br />concurrence and resubmit the partial payment estimate, or submit the original progress <br />payment estimate directly to the City, indicating in writing its reasons for refusing to <br />make the changes necessary to obtain concurrence. <br />1-09.9(3) Withholding Payment <br />The City’s Representative may refuse to recommend the whole or any part of any <br />payment if in the City’s Representative's opinion it would be incorrect to make such <br />recommendation to the City. The City’s Representative may also refuse to recommend <br />any such payment, or because of subsequently discovered evidence or the result of <br />tests, may nullify any such payment previously recommended to such extent as may <br />be necessary in the City’s Representative's opinion to protect the City from loss as a <br />result of: <br />1. Defective or damaged Work. <br />2. A deductive Change Order. <br />3. Persistent failure of the Contractor to perform the Work in accordance with <br />the Contract Documents, including failure to maintain the progress of the <br />Work in accordance with the construction schedule. Persistent failure to <br />maintain the progress of the Work shall mean that for a period of two <br />consecutive months following a written notice from the City’s Representative <br />or City, the Contractor fails to correct a behind-schedule condition at a rate <br />that would reasonably indicate that it will finish the Project on schedule. <br />4. Disregard of authority of the City or City’s Representative or the laws of any <br />public body having jurisdiction. <br />5. Liquidated damages. <br />6. Misrepresentation of the quality of materials or Equipment installed or amount <br />of Work performed.