Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-125 <br /> PROJECT NAME: <br />PROJECT FUNDING: <br />PROJECT COST: <br />c. Contractor shall maintain signs and sign frames in a clearly legible condition <br />throughout the progress of the Work and shall completely remove signs upon <br />project completion. Deliver signs to the City's storage area for future City use. <br />d. No separate payment for Project/Construction Identification Signs will be <br />made. All costs associated with this item shall be merged with the unit <br />contract price for "Mobilization." <br />1-09.9 Payments <br />Delete 1-09.9 and substitute the following: <br />1-09.9 Payments to Contractors <br />(******) <br />1-09.9(1) Progress Payments <br />Contractor shall submit progress payment estimate for completed Work and material <br />on hand based upon acceptable Work performed during the previous period, or since <br />the last partial payment estimate was submitted. Submit progress payment estimate to <br />City’s Representative by the tenth day of each month, or by schedule mutually agreed <br />upon in writing by the Contractor and City’s Representative at the Pre-Construction <br />Conference. Contractor shall make initial progress estimate not later than 30 days after <br />the Work begins. Make successive progress estimates every 4-weeks thereafter until <br />the Completion Date. <br />Progress estimates made during progress of the Work are tentative, and made only for <br />the purpose of determining progress payment. The progress estimates are subject to <br />change at any time prior to the calculation of the Final Payment. <br />The value of the progress estimate will be the sum of the following: <br />1. Unit Price Items in the Proposal Form — the approximate quantity of <br />acceptable units of work completed multiplied by the unit price. <br />2. Lump Sum Items in the Proposal Form — the estimated percentage complete <br />multiplied by the Proposal Forms amount for each Lump Sum Item, or per the <br />schedule of values for that item. <br />3. Materials on Hand — 100 percent of invoiced cost of material delivered to Job <br />site or other storage area approved by the Engineer. <br />4. Change Orders — entitlement for approved extra cost or completed extra <br />work as determined by the Engineer. <br />Progress payments will be made in accordance with the progress estimate less: <br />1. Retainage in accordance with 1-09.9(6) RETAINAGE, <br />2. The amount of Progress Payments previously made, and <br />3. Funds withheld by the City for disbursement in accordance with the Contract <br />Documents. <br />Progress payments for Work performed shall not be evidence of acceptable <br />performance or an admission by the City that any Work has been satisfactorily <br />completed. <br />Payments will be made by warrants, issued by the City’s fiscal officer, against the <br />appropriate fund source for the Project. Payments received on account of Work <br />performed by a Subcontractor are subject to the provisions of RCW 39.04.250. <br />Contractor’s submission of a progress pay estimate constitutes the Contractor’s <br />material representation that Contractor performed all of the Work described in the <br />progress pay estimate during the relevant time period in a conformance with these