My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-142 <br />the flagger. Provide and require all flaggers use two-way radios to signal each other to <br />prevent conflicts and hold traffic when construction activities require. <br />When the Bid proposed includes an item for "Traffic Control Labor," the Work covered <br />by this item shall be for the labor actually used when authorized by the Engineer for: <br />1. The services of flaggers at both ends of a 2-way, single lane operation; or <br />2. The services of flaggers at signalized intersections if off-duty uniformed police <br />officers are not available, or when otherwise specifically directed by the <br />Engineer. <br />The hours eligible for "Traffic Control Labor" shall be for the hours actually worked, <br />plus 1 hour of on-site orientation per flagger. "Show-up time" will not be counted. The <br />labor to perform the Work described in the item "Maintenance and Protection of Traffic <br />Control" is specifically excluded from this Work. No adjustment will be made to the unit <br />price for "Traffic Control Labor" for overtime or holiday hours worked. <br />1-10.3(4)A Traffic Control - Off-Duty Police Officer <br />Contractor shall provide off-duty uniformed Police Officer for traffic control at all <br />signalized intersections. Acceptable sources for off-duty uniformed Police Officers <br />are as follows in order of preference: <br />1. City of Everett Police Department, contact either, <br />a. Officer Rey Palacol, (360) 850-9507 <br />b. Detective Todd Israel, (425) 740-4951 <br />c. Officer Omar Estrada, (425) 512-7186 <br />2. Puget Sound Executive Service, 625 B 5th Ave, Ste 4, Sequim, WA <br />98382 <br />a. Contact Nick Janssen, (360) 681-7737 <br />1-10.3(5) Construction Signs <br />All signs required by the approved traffic control plan(s) as well as any other <br />appropriate signs prescribed by the Engineer will be furnished by the Contractor and <br />be paid under the item "Maintenance and Protection of Traffic Control.” The Contractor <br />shall erect them on posts or supports and maintain them in a clean, neat, and <br />presentable condition until the necessity for them has ceased. All non-applicable signs <br />shall be removed or covered with either metal or plywood during periods when they are <br />not needed. When the need for any of these signs has ceased, the Contractor, upon <br />approval of the Engineer, shall take down these signs, posts, or supports. All signs, <br />posts, and supports shall be removed from the project and shall remain the property of <br />the Contractor. <br />There shall be no separate classification of signs. All construction signs, whether used <br />throughout the construction, during a major phase of construction or removed daily <br />shall be paid under the item "Maintenance and Protection of Traffic Control.” Portable <br />or temporary mountings may require added weight for stability. If it is necessary to add <br />weight to the signs, only a bag of sand that will rupture on impact shall be used. The <br />bag of sand shall have a maximum weight of 40 pounds and shall be suspended no <br />more than 1-foot from the ground. <br />The Work to provide the construction signing shall be: <br />1. Furnishing all construction signs. <br />2. Furnishing, removing, and disposing of the posts or supports for the signs. <br />3. Initial installation and subsequent removal of all construction signs. <br />4. Furnishing labor and materials for maintaining the signs in a clean and <br />presentable condition;
The URL can be used to link to this page
Your browser does not support the video tag.