My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-143 <br />5. All other incidentals necessary for providing the construction signs according <br />to the approved traffic control plan(s). <br />Signs, posts, or supports that are lost, stolen, destroyed, or which the Engineer deems <br />to be unacceptable, while their use is required on the project, shall be replaced by the <br />Contractor without additional compensation. <br />1-10.4 Measurement <br />Delete 1-10.4 and substitute the following: <br />1-10.4 Measurement <br />1-10.4(1) General <br />(******) <br />When the Bid Proposal does not include an item for any necessary traffic control, all <br />costs for traffic control shall be included, by the Contractor, in the unit contract price for <br />the various other items of Work in the Bid Proposal. The Contractor shall estimate <br />these costs based on the contemplated work procedures. <br />When traffic control items are included in the Bid Proposal, payment is limited to the <br />following areas: <br />The entire project area under the Contract and for a distance to include the initial <br />warning signs for the beginning of the Project and the end of construction. Warning <br />signs for side roads on the approved traffic control plan are also included. If the project <br />consists of two or more sections, the limits will apply to each section individually. <br />A detour provided in the Plans or approved by the Engineer for by-passing all or any <br />portion of the construction, irrespective of whether or not the termini of the detour are <br />within the limits of the Contract. <br />The provisions of Section 1-04.6 will not apply to traffic control or traffic control items. <br />However, the item "Maintenance and Protection of Traffic Control" will be considered <br />for an equitable adjustment only when the total Contract price increases or decreases <br />by more than 25 percent. <br />The measurement and payment for the items included in the Bid Proposal for traffic <br />control costs incurred within the limits of 1 and 2 above will be made to the Contractor <br />by the City as described in these Special Provisions. <br />1-10.4(2) Measurement <br />(******) <br />Bid items of Work completed pursuant to the Contract Documents will be measured as <br />described in Division B – Bid Item Descriptions of these Special Provisions and <br />Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />1-10.5 Payment <br />Delete 1-10.5 and substitute the following: <br />1-10.5 Payment <br />(******) <br />Payment for bid items of Work completed pursuant to the Contract Documents will be <br />as described in Division B – Bid Item Descriptions of these Special Provisions and <br />Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.