Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 2 – EARTHWORK March 2024 <br />Work Order No. UP 3814 SP-152 <br />areas in the subgrade. In areas where the subgrade does not stand up to the <br />proof roll, over excavate the subgrade and replace with imported Foundation <br />Material Class A or B or Gravel Borrow, as determined by the Engineer, to bring <br />the subgrade up to the proper compaction and grade. Compact backfill material in <br />accordance with 2-03.3(3). <br />2-03.3(7) Disposal of Surplus Material <br />2-03.3(7)C Contractor-Provided Disposal Site <br />Delete the first paragraph of 2-03.3(7)C and substitute the following: <br />Make arrangements for disposal of surplus and other materials. All costs for <br />disposal of surplus and other materials shall be included with the respective <br />Bid items of the Contract with no direct compensation being made. <br />Dispose of Asbestos-cement pipe in accordance with the requirements of the <br />State of Washington Department of Ecology and the Snohomish County Solid <br />Waste Division. <br />2-03.4 Measurement <br />Delete all paragraphs under 2-03.4 and substitute the following: <br />Bid items of Work completed pursuant to the Contract Documents will be measured as <br />described in Division B – Bid Items Descriptions and provided in Section 1-09 <br />MEASUREMENT AND PAYMENT of the Standard Specifications. <br />2-03.5 Payment <br />Delete all paragraphs under 2-03.5 and substitute the following: <br />Payment for bid items of Work completed pursuant to the Contract Documents will be <br />as described in Division B – Bid Item Descriptions of these Special Provisions and <br />Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />There will be no direct compensation made for haul on material moved within or from <br />the Project site and the Contractor shall include the cost of hauling in his various unit <br />contract prices. <br />There will be no direct compensation made for “Proof Rolling” as required in this <br />section for excavated portions of the roadway and the Contractor shall include costs in <br />his various unit Contract prices. <br />Payment for over excavation below subgrade and disposal of over excavated materials <br />as required in this section shall be included in the Bid item for Foundation Material. <br />Imported material required in this section shall be paid for by the unit Bid price for that <br />material. Payment for placement and compaction of import material shall be included <br />in the unit price per ton of import material. <br /> <br />2-04 HAUL <br />2-04.1 Description <br />Delete the first paragraph of 2-04.1 and substitute the following: <br />This Work shall consist of transporting excavated material from its original site to its <br />final place on the Project or to a Contractor arranged waste site. <br />2-04.3 Vacant <br />Revise 2-04.3 to read as follows: <br />2-04.3 Construction Requirements <br />Off-highway earth-moving equipment shall not haul on or across streets, roadways, <br />driveways, trails, sidewalks or parking lots not being improved in the Contract.