My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 2 – EARTHWORK March 2024 <br />Work Order No. UP 3814 SP-154 <br />2-07.5 Payment <br />Revise 2-07.5 to read as follows: <br />All costs for the Work described in Section 2-07 shall be included with the Work with no <br />direct compensation made. <br /> <br />2-09 STRUCTURE EXCAVATION <br />2-09.2 Materials <br />Supplement 2-09.2 by adding the following at end of the materials list: <br />Foundation Material Class A or B 9-03.17 Standard Specifications <br />Controlled Density Fill 2-09.3(1)E Special Provisions <br />2-09.3 Construction Requirements <br />2-09.3(1) General Requirements <br />2-09.3(1)C Removal of Unstable Base Material <br />Delete all paragraphs in 2-09.3(1)C and substitute the following: <br />When the material at the bottom of an excavation is not stable enough to <br />support the Structure, the Contractor shall excavate below grade to the depth <br />required by the Engineer and replace the unstable material with Foundation <br />Material Class A or B. <br />Place Foundation Material Class A or B in layers not more than six inches <br />thick and compact to minimum of 90-percent maximum density as determined <br />by 2-03.3(14)D. <br />Dispose of unsuitable material removed to make room for foundation material <br />by hauling to a waste site obtained and provided by the Contractor in <br />accordance with 2-03.3(7)C. <br />2-09.3(1)D Disposal of Excavated Material <br />Delete the second paragraph in 2-09.3(1)D and substitute the following: <br />All costs for disposing of excavated material, whether within the Project limits <br />or hauled to a disposal site, shall be incidental to the other Bid items in the <br />Proposal. The City will not pay for hauling. Disposal of excavated material <br />shall meet the requirements of 2-03.3(7)C. <br />2-09.3(1)E Backfilling <br />Delete the fourth paragraph in 2-09.3(1)E and substitute the following: <br />Provide CDF having minimum 28-day strength of 50 psi and maximum 28-day <br />strength not to exceed 300-psi. Provide wet or flowable CDF with consistency <br />having approximate slump between three to ten inches. <br />Controlled Density Fill used for excavation backfill may be placed dry or wet. <br />Use wet, or flowable, CDF for filling abandoned pipes in-place. <br />Supplement 2-09.3(1)E by adding the following: <br />Where CDF is used in lieu of other materials such as foundation material, <br />gravel borrow, washed sand or crushed surfacing top course, the respective <br />limits for trench width or backfill dimensions shall be approved by the <br />Inspector. <br />2-09.3(3)B Excavation Using Open Pits – Extra Excavation <br />Revise the sixth paragraph to read as follows: <br />Submittals and Design Requirements – The Contractor shall submit Type <br />3E Working Drawings with supporting calculations showing the geometry and <br />construction sequencing of the proposed excavation slopes.
The URL can be used to link to this page
Your browser does not support the video tag.