My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 5 – SURFACE TMTS & PVMTS March 2024 <br />Work Order No. UP 3814 SP-159 <br />DIVISION 5 – SURFACE TREATMENTS AND PAVEMENTS <br />5-01 CEMENT CONCRETE PAVEMENT REHABILITATION <br />5-04.3 Construction Requirements <br />5-01.3(1)A2 Cement Concrete for Panel Replacement <br />Delete the second sentence of 5-01.3(1)A2 and substitute the following: <br />Cement concrete for panel replacement shall be rapid hardening <br />hydraulic cement meeting the requirements of section 9-01.2(2). <br />5-01.3(4) Replace Cement Concrete Panel <br />Supplement 5-01.3(4) with the following: <br />Existing concrete pavement panels shall be replacement where indicated on the <br />plans to the thickness and configuration as indicated in the plan details. <br />5-01.4 Measurement <br />Delete all paragraphs in 5-01.4 and substitute the following: <br />Bid items of Work completed pursuant to the Contract Documents will be measured as <br />described in Division B – Bid Item Descriptions of these Special Provisions and <br />Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />5-01.5 Payment <br />Delete all paragraphs in 5-01.5 and substitute the following: <br />Payment for bid items of Work completed pursuant to the Contract Documents will be <br />as described in Division B – Bid Item Descriptions of these Special Provisions and <br />Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> <br />5-04 HOT MIX ASPHALT <br />Delete 5-04 and substitute the following: <br />5-04.1 Description <br />Work shall consist of providing and placing one or more layers of plant-mixed hot mix <br />asphalt (HMA) on a prepared foundation or base in accordance with these Specifications <br />and the lines, grades, thicknesses, and typical cross-sections shown in the Plans. The <br />manufacture of HMA may include warm mix asphalt (WMA) processes in accordance with <br />these Specifications. WMA processes include organic additives, chemical additives, and <br />foaming. <br />Provide HMA composed of asphalt binder and mineral materials as may be required, mixed <br />in the proportions specified to provide a homogeneous, stable, and workable mixture. <br />5-04.2 Materials <br />Provide materials meeting the requirements of the following sections: <br />Asphalt Binder 9-02.1(4) Standard Specifications <br />Cationic Emulsified Asphalt 9-02.1(6) Standard Specifications <br />Anti-Stripping Additive 9-02.4 Standard Specifications <br />HMA Additive 9-02.5 Standard Specifications <br />Aggregates 9-03.8 Standard Specifications <br />Recycled Asphalt Pavement 9-03.8(3)B Standard Specifications <br />Mineral Filler 9-03.8(5) Standard Specifications <br />Recycled Material 9-03.21 Standard Specifications <br />Portland Cement 9-01 Standard Specifications
The URL can be used to link to this page
Your browser does not support the video tag.