My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 5 – SURFACE TMTS & PVMTS March 2024 <br />Work Order No. UP 3814 SP-164 <br />Furnish and install all pins, brackets, tensioning devices, wire, and accessories <br />necessary for satisfactory operation of the automatic control equipment. <br />If the paving machine in use is not providing the required finish, the Engineer may <br />suspend Work as allowed by Section 1-08.6. Thoroughly remove any cleaning or <br />solvent type liquids spilled on the pavement before paving proceeds. <br />5-04.3(3)D Material Transfer Device or Material Transfer Vehicle <br />Provide a Material Transfer Device/Vehicle (MTD/V) with the Engineer’s approval, <br />unless otherwise required by the Contract. <br />Where an MTD/V is required by the contract, the Engineer may approve paving <br />without an MTD/V, at the Contractor’s request. The Engineer will determine if an <br />equitable adjustment in cost or time is due. <br />Mix the MTD/V when used with the HMA after delivery by the hauling equipment <br />and prior to laydown by the paving machine. Sufficiently mix the HMA to obtain a <br />uniform temperature throughout the mixture. The length of the windrow for <br />windrow elevator may be limited in urban areas or through intersections at the <br />discretion of the Engineer. <br />To be approved for use, provide an MTV meeting the following: <br />1. Self-propelled vehicle, separate from the hauling vehicle or paver. <br />2. Not be connected to the hauling vehicle or paver. <br />3. May accept HMA directly from the haul vehicle or pick up HMA from a <br />windrow. <br />4. Ability to mix the HMA after delivery by the hauling equipment and prior to <br />placement into the paving machine. <br />5. Ability to mix the HMA sufficiently to obtain a uniform temperature <br />throughout the mixture. <br />To be approved for use, provide an MTD meeting the following: <br />1. Ability to be positively connected to the paver. <br />2. May accept HMA directly from the haul vehicle or pick up HMA from a <br />windrow. <br />3. Ability to mix the HMA after delivery by the hauling equipment and prior to <br />placement into the paving machine. <br />4. Ability to mix the HMA sufficiently to obtain a uniform temperature <br />throughout the mixture. <br />5-04.3(3)E Rollers <br />Provide vibratory, oscillatory steel wheel rollers, or pneumatic tire type rollers, in <br />good condition and capable of reversing without backlash. Operate roller in <br />accordance with the manufacturer’s recommendations. When ordered by the <br />Engineer for any roller planned for use on the project, provide a copy of the <br />manufacturer’s recommendation for the use of that roller for compaction of HMA. <br />Provide sufficient number and weight of rollers to compact the mixture in <br />compliance with the requirements of Section 5-04.3(10). The use of equipment <br />that results in crushing of the aggregate will not be permitted. Rollers producing <br />pickup, washboard, uneven compaction of the surface, displacement of the <br />mixture or other undesirable results will not be permitted. <br />5-04.3(4) Preparation of Existing Paved Surfaces <br />Bring any irregular existing pavement surface or old base surface to a uniform grade <br />and cross-section as shown on the Plans or approved by the Engineer.
The URL can be used to link to this page
Your browser does not support the video tag.