Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 5 – SURFACE TMTS & PVMTS March 2024 <br />Work Order No. UP 3814 SP-165 <br />Accomplish preleveling of uneven or broken surfaces over which HMA is to be placed <br />by using an asphalt paver, a motor patrol grader, or by hand raking, as approved by <br />the Engineer. <br />Provide compaction of preleveling HMA to the satisfaction of the Engineer and may <br />require the use of small steel wheel rollers, plate compactors, or pneumatic rollers to <br />avoid bridging across preleveled areas by the compaction equipment. Provide <br />Engineer approved compaction equipment used for the compaction of preleveling <br />HMA. <br />Clean the entire surface of the pavement before construction of HMA on an existing <br />paved surface. Entirely remove all fatty asphalt patches, grease drippings, and other <br />objectionable matter from the existing pavement. Thoroughly clean all pavements or <br />bituminous surfaces of dust, soil, pavement grindings, and other foreign matter. Fill all <br />holes and small depressions with an appropriate class of HMA. Level and thoroughly <br />compact the patched area surface. Obtain Engineer approval of the surface prior to the <br />application of tack coat or paving. <br />Apply an asphalt tack coat to all paved surfaces that HMA is to be placed or abutted; <br />except, that tack coat may be omitted from clean, newly paved surfaces at the <br />Engineer’s discretion. Uniformly apply tack coat to cover the existing pavement with a <br />thin film of residual asphalt free of streaks and bare spots at a rate between 0.02 and <br />0.10 gallons per square yard of retained asphalt. Obtain application rate approval from <br />Engineer. Apply a heavy application of tack coat to all joints. For Roadways open to <br />traffic, limit the application of tack coat to surfaces that will be paved during the same <br />working shift. Provide spreading equipment equipped with a thermometer to indicate <br />the temperature of the tack coat material. <br />Do NOT allow equipment to operate on tacked surfaces until the tack has broken and <br />cured. Repair tack coat if the Contractor’s operation damages the tack coat prior to <br />placement of the HMA. <br />Provide tack coat consisting of CSS-1 or CSS-1h emulsified asphalt. The CSS-1 and <br />CSS-1h emulsified asphalt may be diluted once with water at a rate not to exceed one <br />part water to one part emulsified asphalt. Provide tack coat having sufficient <br />temperature such that it may be applied uniformly at the specified rate of application <br />and not exceed the maximum temperature recommended by the emulsified <br />asphalt manufacturer. <br />5-04.3(4)A Crack Sealing <br />5-04.3(4)A1 General <br />When the Proposal includes a pay item for crack sealing, seal all cracks 1/4- <br />inch in width and greater. <br />Cleaning: Ensure that cracks are thoroughly clean, dry and free of all loose <br />and foreign material when filling with crack sealant material. Use a hot <br />compressed air lance to dry and warm the pavement surfaces within the <br />crack immediately prior to filling a crack with the sealant material. Do NOT <br />overheat pavement. Do NOT use direct flame dryers. Routing cracks is not <br />required. <br />Sand Slurry: For cracks that are to be filled with sand slurry, thoroughly mix <br />the components and pour the mixture into the cracks until full. Add additional <br />CSS-1 cationic emulsified asphalt to the sand slurry as needed for workability <br />to ensure the mixture will completely fill the cracks. Strike off the sand slurry <br />flush with the existing pavement surface and allow the mixture to cure. Top off <br />cracks that were not completely filled with additional sand slurry. Do NOT <br />place the HMA overlay until the slurry has fully cured.