My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 5 – SURFACE TMTS & PVMTS March 2024 <br />Work Order No. UP 3814 SP-167 <br />storage facility having an accessible device, indicating the amount of material in <br />storage, located at the top of the cone or about the third point. Engineer will NOT <br />accept HMA from the storage facility when the HMA in storage is below the top of the <br />cone of the storage facility; except, as the storage facility is being emptied at the end of <br />the working shift. <br />Size recycled asphalt pavement (RAP) utilized in the production of HMA prior to <br />entering the mixer to produce a uniform and thoroughly mixed HMA. If there is <br />evidence of the recycled asphalt pavement not breaking down during the heating and <br />mixing of the HMA, immediately suspend the use of the RAP until Engineer approves <br />changes necessary to provide adequate RAP breakdown and mixing. After introducing <br />the required amount of mineral materials, RAP, new asphalt binder and asphalt <br />rejuvenator into the mixer, mix the HMA until complete and uniform coating of the <br />particles and thorough distribution of the asphalt binder throughout the mineral <br />materials, and RAP is ensured. <br />5-04.3(7) Spreading and Finishing <br />Lay the mixture upon an approved surface, spread, and strike off to the established <br />grade and elevation. Provide HMA pavers complying with Section 5-04.3(3) to <br />distribute the mixture. Unless Engineer directs otherwise, provide the nominal <br />compacted layer depth to NOT exceed the following: <br /> <br />HMA Class Course <br />Maximum <br />Compacted Layer <br />Depth (FT) <br />1 inch NA 0.35 <br />3/4 & 1/2 inch Wearing 0.30 <br />3/4 & 1/2 inch Other 0.35 <br />3/8 inch NA 0.15 <br /> <br />On areas where irregularities or unavoidable obstacles make the use of mechanical <br />spreading and finishing equipment impractical, the paving may be done with other <br />equipment or by hand. <br />When more than one JMF is being utilized to produce HMA, place the material <br />produced for each JMF using separate spreading and compacting equipment. Do NOT <br />intermingle HMA produced from more than one JMF. During a work shift place each <br />strip of HMA to a single JMF established for the class of HMA specified, unless there is <br />a need to make an adjustment in the JMF. <br />5-04.3(8) Aggregate Acceptance Prior to Incorporation in HMA <br />For HMA accepted by nonstatistical evaluation the aggregate properties of sand <br />equivalent, uncompacted void content and fracture will be evaluated in accordance <br />with Section 3-04. Sampling and testing of aggregates for HMA accepted by <br />commercial evaluation will be at the Engineer’s option. <br />5-04.3(9) HMA Mixture Acceptance <br />Engineer will use nonstatistical, or commercial evaluation for determining acceptance <br />of HMA. <br />Engineer will use nonstatistical evaluation for the HMA acceptance, unless Contract <br />specifies Commercial Evaluation. <br />Engineer will use Commercial evaluation for Commercial HMA and for other classes of <br />HMA in the following applications: sidewalks, road approaches, paths, trails, temporary
The URL can be used to link to this page
Your browser does not support the video tag.