My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 5 – SURFACE TMTS & PVMTS March 2024 <br />Work Order No. UP 3814 SP-166 <br />Provide sand slurry consisting of approximately 20 percent CSS-1 emulsified <br />asphalt, approximately 2 percent portland cement, water (if required), and the <br />remainder clean Class 1 or 2 fine aggregate per section 9-03.1(2). <br />Thoroughly mix components and then pour into the cracks and joints until full. <br />The following day, top off any cracks or joints that are not completely filled <br />with additional sand slurry. After the sand slurry is placed, strike off filler flush <br />with the existing pavement surface and allow to cure. Do NOT place the HMA <br />overlay until the slurry has fully cured. The requirements of Section 1-06 will <br />not apply to the portland cement and sand used in the sand slurry. <br />In areas where HMA will be placed, use sand slurry to fill the cracks. <br />In areas where HMA will not be placed, fill the cracks as follows: <br />a. Cracks 1/4- inch to 1 inch in width – fill with hot poured sealant. <br />b. Cracks greater than 1 inch in width – fill with sand slurry. <br />Hot Poured Sealant: For cracks that are to be filled with hot poured sealant, <br />apply the material in accordance with these requirements and the <br />manufacturer’s recommendations. Furnish a Type 1 Working Drawing of the <br />manufacturer’s product information and recommendations to the Engineer <br />prior to the start of work, including the manufacturer’s recommended heating <br />time and temperatures, allowable storage time and temperatures after initial <br />heating, allowable reheating criteria, and application temperature range. <br />Confine hot poured sealant material within the crack. Clean any overflow of <br />sealant from the pavement surface. If, in the opinion of the Engineer, the <br />Contractor’s method of sealing the cracks with hot poured sealant results in <br />an excessive amount of material on the pavement surface, stop and correct <br />the operation to eliminate the excess material. <br />5-04.3(4)A2 Crack Sealing Areas Prior to Paving <br />In areas where HMA will be placed, use sand slurry to fill the cracks. <br />5-04.3(4)A3 Crack Sealing Areas Not to be Paved <br />In areas where HMA will not be placed, fill the cracks as follows: <br />a. Cracks 1/4 inch to 1 inch in width – fill with hot poured sealant. <br />b. Cracks greater than 1 inch in width – fill with sand slurry. <br />5-04.3(4)B Vacant <br />5-04.3(4)C Vacant <br />5-04.3(6) Mixing <br />After the required amount of mineral materials, asphalt binder, recycling agent and <br />anti-stripping additives have been introduced into the mixer, mix the HMA until <br />complete and uniform coating of the particles and thorough distribution of the asphalt <br />binder throughout the mineral materials is ensured. <br />Ensure the temperature of the HMA when discharged does not exceed the optimum <br />mixing temperature by more than 25°F as shown on the reference mix design report or <br />as approved by the Engineer. Also, when a WMA additive is included in the <br />manufacture of HMA, ensure the discharge temperature of the HMA does not exceed <br />the maximum recommended by the manufacturer of the WMA additive. A maximum <br />water content of 2 percent in the mix, at discharge, will be allowed providing the water <br />causes no problems with handling, stripping, or flushing. If the water in the HMA <br />causes any of these problems, reduce the moisture content in accordance with <br />Engineer’s directions. <br />Storing or holding of the HMA in approved storage facilities for less than 24 hours will <br />be permitted with Engineer’s approval. Engineer will reject HMA held for more than 24 <br />hours after mixing. Dispose of rejected HMA at no expense to the City. Provide the
The URL can be used to link to this page
Your browser does not support the video tag.