<br />Bid Item A01, B01, C01, D01 - Mobilization
<br />Specification Section 1-09
<br />Measurement and Payment: Lump Sum (LS)
<br />The lump sum bid for mobilization shall constitute complete compensation for all of Contractor’s
<br />preconstruction costs of preparatory work and operations including, but not limited to, those
<br />necessary for the movement of the Contractor’s personnel, equipment, supplies and incidentals
<br />to the Project; for the establishment of its offices, buildings and other facilities necessary for Work
<br />on this Project; for premiums on bonds and insurance for the Project, and for Work and
<br />operations that the Contractor must perform or costs it must incur before beginning production
<br />work on the various items on the Project. Mobilization also includes, but is not limited to, posting
<br />construction identification signs, securing permits, establishing safety and security measures,
<br />preparing a traffic control plan(s), preconstruction photographs, developing a Schedule of Values
<br />for lump sum bid items, submitting the project schedule and providing product and material
<br />submittals, and posting of notices and jobsite posters as required by WSDOT 1-07.9(2). Also
<br />include mobilization costs for all subcontracted work along with all costs for utility coordination
<br />noted on the Plans and in the Specifications.
<br />Items not included in this item include, but are not limited to:
<br />(a) Work covered by a specific bid item or Work that is to be included in a bid item or
<br />items.
<br />(b) Profit, interest on borrowed money, overhead or management costs.
<br />
<br />Partial payments will be made for the lump sum contract price for “Mobilization” as follows:
<br />(a) When 5% of the total original contract amount is earned from other bid items, 50% of
<br />the amount bid for mobilization, or 5% of the total original contract amount, whichever
<br />is the least, will be paid.
<br />(b) When 10% of the total original contract amount is earned from other bid items. 100%
<br />of the amount bid for mobilization, or 10% of the total contract amount, whichever is
<br />the least, will be paid.
<br />Upon substantial completion, payment of any amount bid for mobilization in excess of 10% of the
<br />total original contract amount will be paid.
<br />Bid Item A02, B02, C02, D02 - Surveying
<br />Specification Section 1-05
<br />Measurement and Payment: Lump Sum (LS)
<br />The lump sum bid for surveying includes, but is not limited to, all costs associated with furnishing
<br />all labor, tools, survey instruments materials, and other equipment necessary for the setting and
<br />monitoring the location, elevation, alignment and grade of the Work as specified in 1-05.4
<br />CONFORMITY WITH AND DEVIATIONS FROM PLANS AND STAKES and the Plans.
<br />The lump sum bid item also includes, but is not limited to, all costs associated with furnishing all
<br />labor, tools, survey instruments, materials and other equipment necessary for verifying the
<br />surface and invert elevations, prior to construction, of all existing pipes and fittings where
<br />connections are to be made.
<br />The lump sum bid item also includes, but is not limited to, all costs associated with furnishing all
<br />labor, tools, survey instruments, materials and other equipment necessary for setting and
<br />monitoring the settlement monitoring points for Bid Item A02 as specified in 2-09.3(5) and the