My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div B – BID ITEM DESCRIPTIONS March 2024 <br />Work Order No. UP 3814 SP-26 <br />constructed” location and elevations of the Work, and other information necessary for production <br />of the Record Drawing (As-Constructed) documents meeting the requirements defined in <br />RECORD DRAWINGS as specified in 1-08.11 of these Special Provisions. <br />Partial payments will be made for the lump sum contract price for “Surveying” as follows: <br />(a) When 10% of the total original contract amount is earned from other bid items, 50% <br />of the amount bid for surveying will be paid. <br />(b) When redlines are received for preparing RECORD DRAWINGS, including all <br />information described above, 100% of the amount bid for surveying will be paid. <br />Bid Item A03, B03, C03, D03 - Spill Prevention, Control & Countermeasures (SPCC) Plan <br />Specification Section 1-07 <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid for the Spill Prevention, Control & Countermeasures (SPCC) Plan includes, but <br />is not limited to, all costs associated with complying with the requirements of Section 1-07.15(1) <br />of the Standard Specification. <br />Bid Item A04, B04, C04, D04 - Force Account <br />Specification Section 1-09 <br />Measurement and Payment: Force Account (FA) <br />This Force Account bid item shall be accomplished in accordance with 1-09.6 FORCE <br />ACCOUNT; except, as modified below. <br />The Force Account bid item has been included for specific miscellaneous work items listed below <br />and for any additional work directed by the Engineer that is not required by the original Contract <br />and to address changed conditions or unanticipated work. The amount indicated in the Proposal <br />for this bid item is to provide a common bid amount. The actual amount paid under this bid item <br />may vary from no payment to the full amount of the bid item. <br />In lieu of the preceding prescribed method of determining payment for Force Account work, <br />payment may be made at unit prices or lump sum prices agreed to by the Engineer and the <br />Contractor prior to beginning the Force Account work. <br />(a) Cost for additional excavation, fittings, and labor to make grade adjustments to the <br />new watermain for unknown underground conflicts and conflicts due to being <br />unmarked or mismarked utilities in the field. <br />(b) Restoration of existing special private improvements including, but not limited to, <br />brick or stone walkways, decorative concrete walks or driveways, concrete masonry <br />or stone walls, rockery’s, fences, landscape plantings, reset mailbox supports, <br />including but not limited to, hedges, trees, flowerbeds, irrigation systems, yard <br />lighting, rockeries, retaining walls, or steps. <br />(c) Adjustment to utility lids/covers, catch basin or manhole grates/covers to finished <br />grade, reset disturbed survey benchmark or monuments. <br />Bid Item A05, B05, C05, D05 - Record Drawings (Minimum Bid $____) <br />Specification Section 1-08 <br />Measurement and Payment: Lump Sum (LS) <br />Payment for this item will be made on a prorated monthly basis for work completed in accordance <br />with section 1-08.11 up to 75% of the lump sum bid. The final 25% of the lump sum item will be <br />paid upon submittal and approval of the completed Record Drawings set prepared in <br />conformance with these Special Provisions. <br />Surveying required for preparing record drawings shall be paid under “Surveying” bid item.
The URL can be used to link to this page
Your browser does not support the video tag.