Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div B – BID ITEM DESCRIPTIONS March 2024 <br />Work Order No. UP 3814 SP-28 <br />This lump sum bid item includes the maintenance and protection of traffic control materials, tools, <br />and equipment necessary to accomplish the Work in accordance with 1-10.3(2) MAINTENANCE <br />AND PROTECTION OF TRAFFIC CONTROL, including yet not limited to, signs, barricades, <br />cones, flashers, reader boards, and temporary pavement markings. <br />Bid Item A11, B10, C11, D11 - Trench Excavation Safety Systems <br />Specification Section 2-09 <br />Measurement and Payment: Unit Price per Square Foot (SF) <br />Measurement for trench excavation safety systems shall be square foot of trench installed. <br />The square foot bid item includes the costs directly allocated to the safety system for trenches <br />and all other excavations including, but not limited to, shoring, benching, bracing, excavation, <br />sheeting, and trench box. This Work shall be accomplished in accordance with Divisions 1, 2, 7, <br />and 8 of the Standard Specifications and these Special Provisions. Payment per lump sum <br />includes all equipment, materials, labor, installation, and removal, and all other work required to <br />meet the trench excavation and safety system requirements. <br />Bid Item A12, B11 C12, D12 - Street Cleaning and Sweeping <br />Specification Section 8-01 <br />Measurement and Payment: Unit Price per Hour (HR) <br />The unit price per hour for Street Cleaning & Sweeping shall be full compensation for all labor, <br />tools, incidentals, and equipment necessary to provide the street sweeping, cleaning, and dust <br />control water required for this project. <br />Measurement for street sweeping and cleaning will be by the hour for the actual time consumed <br />in pavement sweeping, cleaning and debris removal. No allowance will be made for time <br />consumed in making repairs to the equipment or for moving the equipment to or from the site on <br />which the street cleaning is ordered. No separate payment will be made for water required for <br />dust control and the normal operation of the pickup sweepers. <br />Bid Item A13, B12, C13, D13 - Erosion/Water Pollution Control <br />Specification Section 8-01 <br />Measurement and Payment: Force Account (FA) <br />This Force Account bid item shall be accomplished in accordance with 1-09.6 FORCE <br />ACCOUNT; except, as modified below. <br />Erosion/Water Pollution Control, Force Account, shall constitute full compensation for all labor, <br />materials, tools and equipment necessary and incidental for the installation, maintenance and <br />removal of the temporary erosion and sedimentation control (TESC) facilities to prevent pollution, <br />erosion, siltation, and damage to any wetland, stream, other watercourse, or surrounding <br />property throughout the life of the Contract. TESC facilities shall include, but not be limited to, any <br />cover measures, runoff control measures, soil and site stabilization measures, silt fencing as <br />shown on the Plans, and inlet protection measures for the work area and downstream areas. <br />The TESC measures shall limit the erosion possibility by covering disturbed soils, preventing <br />sloughing or raveling of cut and natural slopes, and controlling surface runoff from flowing into <br />excavations using measures such as curbs, berms, dikes, rock-lined ditches, and other approved <br />measures. Filter fabric fence shall be used to treat small areas of non-concentrated runoff prior to <br />discharge from the site. <br />Bid Item A14, B13, C14, D14 - Saw-Cutting Asphalt Concrete Pavement, Final Joint Cut, <br />Up To 6-Inch Thickness <br />Specification Section 2-02 <br />Measurement and Payment: Unit Price per Linear Foot (LF) <br />Measurement for saw-cutting will be per linear foot along the true length of the surface cut.