Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div B – BID ITEM DESCRIPTIONS March 2024 <br />Work Order No. UP 3814 SP-29 <br />The unit price per lineal foot for the final saw-cutting of asphalt concrete pavement, up to 6-inch <br />thickness, shall be full compensation for all labor, material, tools, and equipment necessary to <br />satisfactorily complete the Work as specified in Section 2-02.3(3) of the Special Provisions and <br />as shown on the Plans. The unit price per lineal foot for the final saw-cutting of asphalt concrete <br />pavement, up to 6-inch thickness includes, but is not limited to, the saw-cutting necessary for the <br />final joint between existing pavement and permanent HMA pavement. <br />Include cost of cleanup by vacuum collection and disposal of the cuttings slurry with this bid item <br />as there will be no separate payment for cleanup. <br />Bid Item A15, B14, C15 - Saw-Cutting Asphalt Concrete Pavement, Final Joint Cut, <br />Additional 1-Inch Thickness <br />Specification Section 2-02 <br />Measurement and Payment: Unit Price per Linear Foot (LF) <br />Measurement for saw-cutting will be per linear foot along the true length of the surface cut. <br />The unit price per lineal foot for the final saw-cutting of asphalt concrete pavement, for each full <br />1-inch depth beyond the initial 6-inch thickness, shall be full compensation for all labor, material, <br />tools, and equipment necessary to satisfactorily complete the Work as specified in Section 2- <br />02.3(3) of these Special Provisions and as shown on the Plans. The unit price per lineal foot for <br />the final saw-cutting of concrete pavement, additional 1-inch thickness includes, but is not limited <br />to, the saw-cutting necessary for the final joint between existing pavement and permanent HMA <br />pavement. <br />Include cost of cleanup by vacuum collection and disposal of the cuttings slurry with this bid item <br />as there will be no separate payment for cleanup. <br />Bid Item A16 - Saw-Cutting Concrete Pavement, Final Joint Cut, Up To 8-Inch Thickness <br />Specification Section 2-02 <br />Measurement and Payment: Unit Price per Linear Foot (LF) <br />Measurement for saw-cutting will be per linear foot along the true length of the surface cut. <br />The unit price per lineal foot for the final saw-cutting of concrete pavement, up to 8-inch <br />thickness, shall be full compensation for all labor, material, tools, and equipment necessary to <br />satisfactorily complete the Work as specified in Section 2-02.3(3) of these Special Provisions and <br />as shown on the Plans. The unit price per lineal foot for the final saw-cutting of concrete <br />pavement, up to 8-inch thickness includes, but is not limited to, the saw-cutting necessary for the <br />final joint between existing concrete pavement and permanent concrete pavement repair. <br />Include cost of cleanup by vacuum collection and disposal of the cuttings slurry with this bid item <br />as there will be no separate payment for cleanup. <br />Bid Item A17, B15, C16 - Saw-Cutting Concrete Curb & Gutter, Sidewalk, and Driveway <br />Specification Section 2-02 <br />Measurement and Payment: Unit Price per Linear Foot (LF) <br />Measurement for saw-cutting will be per linear foot along the true length of the surface cut. <br />The unit price per lineal foot for the final saw-cutting of concrete curb and gutter, sidewalk, and <br />driveway shall be full compensation for all labor, material, tools, and equipment necessary to <br />satisfactorily complete the Work as specified in Section 2-02.3(3) of these Special Provisions and <br />as shown on the Plans. The unit price per lineal foot for the final saw-cutting of concrete curb and <br />gutter, sidewalk, and driveway includes, but is not limited to, the saw-cutting necessary for the <br />final joint between existing concrete sidewalk, driveway, or curb and permanent concrete repair. <br />Include cost of cleanup by vacuum collection and disposal of the cuttings slurry with this bid item <br />as there will be no separate payment for cleanup.