My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-50 <br />Contract Execution Date: The date the Mayor of the City of Everett signs the <br />Contract or the date that the Contractor signs the Contract, whichever date is later. <br />This officially binds the Contractor to the Contract. <br />Contract Sum: The price in dollars stated in the Contract to be paid by the City to the <br />Contractor for the Work described in the Contract Documents, as modified by Change <br />Orders. <br />Contract Time: The period of time established by the terms and conditions of the <br />Contract within which the Work must be physically completed. <br />COVID-19: Disease related to the novel coronavirus (SARS-CoV-2), which is the <br />subject of Governor’ Inslee’s proclamation dated February 29, 2020, and subsequent <br />proclamations. <br />COVID-19 Requirements: All governmental laws, regulations, requirements, and <br />orders relating to COVID-19, including without limitation OSHA, L&I or other safety <br />rules relating to COVID-19 and COVID-19 gubernatorial proclamations and orders. <br />Delay: Any increase in the duration of the critical path of the Project. <br />Dispute: Any controversy or disagreement. <br />Equipment: Mechanical, electrical, instrumentation, or other devices with one or more <br />moving parts, or devices requiring an electrical, pneumatic, electronic, or hydraulic <br />connection. <br />Extended Overhead: The increase in Overhead costs attributable to an extension of <br />Contract Time. <br />Extra Work: Providing materials and Equipment and the performance of Work not <br />directly called for in, or implied by, the Contract Documents, such that Contractor <br />would be entitled to an adjustment of Contract Sum and possibly an extension of <br />Contract Time. <br />Final Acceptance: Formal action by Everett City Council determining that all of the <br />Contractor's Work has been completed, except for any landscaping maintenance. <br />Float: The amount of time between the early start date and the late start date, or the <br />early finish date and the late finish date of an activity in the Project schedule. <br />Force Account: Costs of performing Work as defined in 1-09.6 FORCE ACCOUNT. <br />Furnish: To deliver items, Equipment, or material to the job site or other specified <br />location. <br />Install: Placing, erecting, or constructing complete in place items, Equipment, or <br />material. <br />May: Conduct that is permitted, but not required. <br />Notice: A signed, written communication by the Contractor to the City as described in <br />1-04.5 NOTICE BY CONTRACTOR of these Special Provisions. <br />Notice of Award: The written notice from the City of Everett to the successful Bidder <br />signifying the City’s acceptance of the Bid. No Contract is formed until the Contract <br />Execution Date. <br />Notice to Proceed: The written Notice from the City or City’s Representative to the <br />Contractor authorizing and directing the Contractor to proceed with the Work and <br />establishing the date on which the Contract Time begins. Multiple and partial Notices to <br />Proceed may be issued on a single Project. <br />Over absorbed Overhead: Over recovery of fixed indirect costs that occurs when a <br />Contractor performs more overall Work than it otherwise would have performed. <br />Overhead <br />In general, Overhead for the purpose of calculating additional compensation under this <br />section of the Contract shall include only those costs that are expended for the
The URL can be used to link to this page
Your browser does not support the video tag.