Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-51 <br />administration of the business as a whole. Such costs usually accrue or are incurred <br />due to the passage of time, or cannot be traced to a particular project or contract, or <br />both. <br />Examples of possible Overhead costs include, but are not limited to, General and <br />Administrative salaries and benefits, rent, general company insurance, exclusive of <br />insurance on owned equipment that is directly job costed, depreciation on office <br />facilities, utilities, maintenance, office supplies, general company accounting and legal <br />fees, exclusive of amounts expended directly on any specific project, personal property <br />taxes, general company business licenses, dues and subscriptions. <br />The following costs and expenses are excluded from the definition and calculation of <br />Overhead. Overhead costs that vary substantially with the volume of Work performed, <br />as measured by billings, shall not be included in Overhead for the purpose of <br />determining additional compensation for Extended or Unabsorbed Home Office <br />Overhead, or both. <br />Examples of costs that are not included in Overhead include: travel and business <br />meetings, telephones, professional fees expended for the benefit of a specific project, <br />union welfare benefits, payroll taxes and equipment rental. <br />If related party transactions are included in a Contractor’s Overhead, they must be <br />explicitly identified as related party transactions and must not exceed amounts that <br />would be incurred in an arms-length transaction for the provision of the same or similar <br />goods and services. If such transactions exist and the amounts paid by the Contractor <br />and included in Overhead are in excess of that which would normally be expended in <br />an arms-length transaction, an adjustment, in the form of a reduction in the amount for <br />calculation purposes, must be included in any calculation in determining the amount of <br />Allocable Overhead. <br />Overhead shall not include any cost directly attributable to a particular project. If a cost <br />can be traced to a particular contract, the Contractor may not classify the cost as <br />Overhead. <br />Indirect or home office costs that vary substantially with the amount of Work performed <br />shall not be included in the group of costs comprising Overhead. <br />Overhead shall not include any costs specifically disallowed by Federal Acquisition <br />Regulations, Subpart 31.2 – Contracts with Commercial Organizations, or its <br />successor. Further, “Overhead” shall not include the costs of any “field support <br />services” that are more closely direct costs in nature, regardless of the manner in <br />which the Contractor normally accounts for such costs. An example of such disallowed <br />cost would be for material handling and expediting, which are costs incurred for the <br />direct support and benefit of any specific project(s). <br />In addition to compliance with Federal Acquisition Regulations, Subpart 31.2 examples <br />of specific costs not allowed in a calculation under this Section of the Contract are <br />Incentive Compensation paid to personnel classified as Overhead and otherwise <br />includable under this Section of the Contract, travel and business meetings, employer <br />paid benefits and taxes on direct payroll costs of any project, insurance costs directly <br />identifiable to any specific project, penalties, and any costs incurred regarding <br />company owned equipment normally classified as a direct project costs,. <br />Person: Includes individuals, associations, firms, companies, corporations, <br />partnerships, and joint ventures. <br />Project: The undertaking to be performed under the provisions of the Contract. <br />Provide: Furnish and Install, complete in place. <br />Punch List: List of incomplete items of Work and of items of Work that do not conform <br />to the requirements of the Contract Documents. The Punch List is prepared after <br />Substantial Completion.