My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-61 <br />1-04 SCOPE OF THE WORK <br />1-04.1 Intent of the Contract <br />Supplement 1-04.1 by adding the following: <br />1-04.1(3) Specifications and Plans <br />(******) <br />1-04.1(3)A Interpretation of Specifications and Plans <br />The Specifications and Plans are intended to be explanatory and supportive of <br />each other. Work specified on the Plans and not in the Specifications, or vice <br />versa, shall be executed as if specified in both. In the event the Work to be done <br />or matters relative thereto are not sufficiently detailed or explained in the Contract <br />Documents, the Contractor shall immediately ask the City’s Representative for <br />further explanation and shall comply with such explanation. In the event of doubt <br />or question arising respecting the true meaning of the Specifications or Plans, <br />Contractor shall refer to the City’s Representative for its decision. <br />1-04.1(3)B Division of Specifications and Plans <br />Specifications and Plans are divided into groups for convenience. These divisions <br />are not for the purpose of apportioning Work or responsibility for Work among <br />Subcontractors, Suppliers and manufacturers. The Contractor is responsible for all <br />Work shown or described, regardless of location(s) in the Contract Documents. <br />1-04.1(3)C Discrepancies in Specifications and Plans <br />1-04.1(3)C(1) Errors and Omissions <br />If the Contractor becomes aware of any errors or omissions in the Contract <br />Documents or in the City's field work, it shall immediately inform the City’s <br />Representative in writing. The City’s Representative will promptly review the <br />matter and if it finds an error or omission has been made; it will determine the <br />corrective actions and advise the Contractor accordingly. If the corrective <br />work associated with an error or omission increases or decreases the amount <br />of Work called for in the Contract, the City will issue an appropriate Change <br />Order. After discovery by the Contractor of an error or omission, related Work <br />performed by the Contractor shall be done at its risk unless authorized by the <br />City’s Representative and approved by the City. <br />1-04.1(3)C(2) Conflicting Provisions <br />In the event an item of Work is described differently in two or more locations <br />on the Plans, in the Specifications and Special Provisions, the Contractor <br />shall, upon request of the City’s Representative, submit in writing to the City’s <br />Representative the description upon which the Contractor relied in preparing <br />its Bid or laying out the Work. <br />1-04.1(3)D Utilities <br />1-04.1(3)D(1) General <br />The City has endeavored to determine the existence of public and private <br />utilities at the site of the Work from the records of the owners of known <br />utilities in the vicinity of the Work. The positions of these utilities as derived <br />from such records are shown on the Plans. The service connections to the <br />gas, electric, cable TV and communication utilities are not shown on the <br />Plans. Refer to 1-07.17 UTILITIES AND SIMILAR FACILITIES regarding <br />Contractor’s responsibility for locating and verifying underground public and <br />private utilities. <br />1-04.1(3)D(2) Unknown/Incorrectly Marked Utilities <br />When a utility interferes with the Work and is either (1) not identified on the <br />Plans or (2) located in a position significantly different from that specified on
The URL can be used to link to this page
Your browser does not support the video tag.