Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-62 <br />the Plans or in accordance with a particular utility’s standard depth and <br />location, Contractor shall follow the procedures of 1-04.7 DIFFERING SITE <br />CONDITIONS (CHANGED CONDITIONS). Interference with the Work is <br />defined as a utility that crosses or projects into the plane of the Work at an <br />elevation between the top and bottom of the Work. <br />1-04.2 Coordination of Contract Documents, Plans, Special Provisions <br />Specifications, and Addenda <br />Revise the first and second paragraphs of 1-04.2 to read as follows: <br />The complete Contract includes Division C – CONTRACT, Division P - PROPOSAL, <br />Division B – BID ITEM DESCRIPTIONS, Special Provisions, Contract Plans, Standard <br />Specifications, Standard Plans in effect as of the date Bids are opened, Addenda, <br />supplemental agreements, change orders, certifications and affidavits required by this <br />Contract and by law, and Federal requirements that apply to this Contract and Project. <br />These parts complement each other in describing a complete Work. Any requirement <br />in one part binds as if stated in all parts. The Contractor shall provide any Work or <br />materials clearly implied in the Contract even if the Contract does not mention it <br />specifically. <br />Any inconsistency in the parts of the Contract shall be resolved by following this order <br />of precedence: <br />1. Change Orders, <br />2. Addenda, <br />3. Division C – CONTRACT, <br />4. Division P - PROPOSAL, <br />5. Division B – BID ITEM DESCRIPTIONS <br />6. Special Provisions, <br />7. Contract Plans, <br />8. City’s Standard Drawings (if any) <br />9. WSDOT/APWA Standard Specifications for Road, Bridge, and Municipal <br />Construction, <br />10. WSDOT/APWA Standard Plans for Road, Bridge and Municipal Construction. <br />Revise the seventh paragraph of 1.04.2 to read as follows: <br />In case of any ambiguity or dispute over interpreting the Contract, the Engineer’s <br />decision will be final as provided in 1-05.1 AUTHORITY OF THE ENGINEER. <br />1-04.3 Reference Information <br />Revise 1-04.3 to read as follows: <br />Reference Information provided to the Contractor is not part of the Contract. The City <br />of Everett does not guarantee the accuracy of the Reference Information and is not <br />responsible for the content of the Reference Information in any manner. Any use of <br />Reference Information by the Contractor is done solely at the Contractor’s risk. <br />1-04.4 Changes <br />Delete 1-04.4 and substitute the following: <br />1-04.4 Changes <br />1-04.4(1) City’s Right to Direct Changes to the Work <br />(******) <br />The City reserves the right to change the Work at any time. Such changes shall not <br />invalidate the Contract nor release the Surety, and the Contractor agrees to perform <br />the Work as changed. Among others, these changes and alterations may include: