CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-70 <br />Work. The Contractor shall perform the Work according to these supplemental <br />drawings and explanations. <br />In addition to supplemental drawings furnished by the Engineer, the Contract <br />Documents may also be supplemented by Type 1, Type 2 or 2E, and Type 3 or 3E <br />Working Drawings prepared by the Contractor, material supplier, or manufacturer, <br />when necessary or as required by the Contract Documents to detail and illustrate <br />portions of the Work. All types of Working Drawings shall be reviewed by the Engineer <br />before work pursuant to those Working Drawings is performed. Type 3 and 3E Working <br />Drawings may include, and not be limited to, shop details, erection plans, masonry lay- <br />out diagrams, reinforcing steel and bending diagrams, post tensioning plans, shoring, <br />cribbing, cofferdam, or falsework plans, formwork plans, or hydraulic items. Type 2 and <br />2E Working Drawings may include, and not be limited to, Catalog cuts or standard <br />plans for commonly used manufactured items. <br />The Contractor shall be fully responsible for the accuracy of dimensions and details on <br />Working Drawings, and for complete conformity with the Contract Documents, even if <br />the Working Drawings have been approved by the Engineer, or if the Contractor and <br />the Engineer agree on dimensions and details. The City does not accept Working <br />Drawings as accurate or adequate, and does not take responsibility for, or warrant that <br />Working Drawings will meet Contract requirements. <br />Engineer's review of Working Drawings shall not relieve Contractor from responsibility <br />for variation from the requirements of the Contract Documents unless Contractor has <br />in writing called the Engineer's attention to each such variation at the time of <br />submission, and the Engineer has given written approval of each such variation by a <br />specific written notation thereof incorporated in or accompanying the returned Working <br />Drawing; nor will review by Engineer relieve Contractor from responsibility for errors or <br />omissions in the Working Drawings or from responsibility for having complied with the <br />provisions of this section. <br />The Bid prices shall include all costs for furnishing Working Drawings and Submittals. <br />The following listed sections of the Standard Specifications and Special Provisions <br />require Working Drawings that may or may not be applicable to this specific project. <br />This list is supplied as an aid to the Contractor and is by no means complete. Submittal <br />requirements may be found in 1-05.3(1) or elsewhere in these Special Provisions. <br />DIVISION 2 EARTHWORK <br />2-09.3(3)D Shoring, Cribbing, and Cofferdams-Shop Drawings <br />DIVISION 7 DRAINAGE STRUCTURES, STORM SEWERS, SANITARY <br />SEWERS, WATER MAINS, AND CONDUITS <br />7-09 Water Mains <br />7-09.2 Materials-Catalog Cuts or Standard Plans <br />7-12 Valves For Water Mains <br />7-12.2 Materials-Catalog Cuts or Standard Plans <br />7-14 Hydrants <br />7-14.2 Materials-Catalog Cuts or Standard Plans <br />7-15 Service Connections <br />7-15.2 Materials-Catalog Cuts or Standard Plans <br />7-17 Sanitary Sewers <br />7-17.2 Materials-Catalog Cuts or Standard Plans <br />DIVISION 8 MISCELLANEOUS CONSTRUCTION <br />8-05 Private Improvements <br />8-05.2 Materials-Catalog Cuts or Standard Plans