CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-71 <br />8-13 Monument Cases <br />8-13.2 Materials-Standard Plans <br />Deviations from Standard Plans will be subject to a Working Drawing submitted by the <br />Contractor and approved by the Engineer. Where a Working Drawing is required by the <br />Specifications, related Work performed prior to completion of the Engineer's review of <br />the pertinent submission will be the sole expense and responsibility of the Contractor. <br />Supplement 1-05.3 by adding the following: <br />1-05.3(1) Submittals <br />(******) <br />Where required by the Contract Documents, the Contractor shall submit information, <br />such as Working Drawings that will enable the City’s Representative to advise the City <br />whether the Contractor's proposed materials, Equipment or methods of work are in <br />general conformance to the design concept and in compliance with the Plans and <br />Specifications. Approval or acceptance of a Submittal does not relieve Contractor from <br />complying with Contract requirements. The City’s approval of a Submittal does not <br />constitute a waiver of the Contract requirements. The City will not be obligated to <br />accept or pay for Work performed by the Contractor that may be affected by materials, <br />Equipment, or methods of work not submitted in a timely manner so that final review <br />can be accomplished before the affected Work is complete. The City shall not be <br />responsible for Delays, inefficiencies, or any additional costs or expenses caused in <br />whole or in part by Contractor’s failure to submit required information in sufficient time <br />for review, comment, and correction. Contractor’s failure to submit required information <br />in sufficient time for review, comment and correction shall be deemed a waiver of any <br />and all Contract Claims for adjustment of Contract Sum or Contract Time arising out of, <br />or related to, such a Submittal. Contractor acknowledges and agrees that it may not <br />rely upon receiving the City’s response to a Submittal in less than 14 calendar days, <br />unless the City explicitly changes this section by a signed Change Order. <br />1-05.3(2) Requests for Information <br />(******) <br />Requests for information or clarification from the Contractor to the City shall be treated <br />as a Submittal pursuant to 1-05.3(1) SUBMITTALS. <br />1-05.4 Conformity With and Deviations From Plans and Stakes <br />Delete all of 1-05.4 and substitute the following: <br />The Contractor shall be responsible for setting and maintaining all alignment stakes, <br />slope stakes, and grades necessary for the construction of the roadbed, surfacing, <br />paving, channelization, illumination, signing, bridges, and retaining walls, if such <br />construction is included in this Project. Except for the survey control data to be <br />furnished by the City, calculations, surveying, and measuring required for setting and <br />maintaining the necessary lines and grades shall be the Contractor's responsibility. <br />The Contractor shall provide the City with copies of such calculations and staking data <br />when requested by the Engineer. Copies of the City provided survey control data are <br />available for the Bidder's inspection at the office of the Project Engineer. <br />Any staking requirements for the Project that do not fit field conditions will be reviewed <br />and if necessary adjusted by the Engineer. Any necessary revisions to the staking <br />information will be provided to the Contractor for use in completing the Work. <br />Stakes, marks, and other reference points, including existing monumentation, set by <br />the City shall be carefully preserved by the Contractor. The Contractor will be charged <br />for the costs of replacing stakes, markers and monumentation that were not to be <br />disturbed but were destroyed or damaged by the Contractor's operations. This charge <br />will be deducted from monies due or to become due to the Contractor.