Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-77 <br />the City will establish the completion date and certify the Work as complete. The <br />following shall occur before the completion date can be established: <br />The Final Contract Voucher Certification shall be signed by the Contractor <br />verifying agreement to the final contract price. <br />The physical work on the Project shall be complete. <br />The Contractor shall furnish all documentation required by the Contract and <br />required by law, necessary to allow the City to certify the Contract as complete. <br />A certificate of completion for the Work, signed by the City, will constitute acceptance <br />of the Work. The issuance of this certificate of completion will not constitute <br />acceptance of unauthorized or defective Work, Equipment, or materials. <br />The Contractor agrees that neither completion nor final acceptance shall relieve the <br />Contractor of the responsibility to indemnify, defend, and protect the City against any <br />claim or loss resulting from the failure of the Contractor, or the Subcontractors or lower <br />tier subcontractors, to pay all laborers, mechanics, Subcontractors, materialpersons, or <br />any other person who provides labor, supplies, or provisions for carrying out the Work <br />or for any payments required for unemployment compensation under Title 50 RCW or <br />for industrial insurance and medical aid required under Title 51 RCW. <br />Failure of the Contractor to perform all of the Contractor's obligations under the <br />Contract shall not bar the City from unilaterally certifying the Contract complete so the <br />Engineer may calculate a final contract price as provided in 1-09.9 PAYMENTS. <br />1-05.13 Superintendents, Labor and Equipment of Contractor <br />Delete 1-05.13. <br />1-05.14 Cooperation With Other Contractors <br />Delete all of 1-05.14 and substitute the following: <br />Nothing in the Contract shall be interpreted as granting to the Contractor exclusive <br />occupancy of the Project area. The Contractor shall ascertain to its own satisfaction <br />the scope of the Project and the nature of any other contracts that have been or may <br />be awarded by the City in the construction of the Project, or to the end that the <br />Contractor may perform this Contract in the light of such other contracts, if any. <br />The Contractor shall not cause unnecessary hindrance or Delay to others working on <br />this or other projects. If the performance of a contract for the Project is likely to be <br />interfered with by the simultaneous performance of some other contract or contracts, <br />the Engineer will decide which Contractor shall cease Work temporarily and which <br />Contractor shall continue, or whether the Work under the contracts can be coordinated <br />so that the contractors may proceed simultaneously. On all questions concerning <br />conflicting interest of contractors performing related Work, the decision of the Engineer <br />shall be binding upon all contractors concerned and the City, the Engineer, the City's <br />Representative, and their consultants shall not be responsible for any damages <br />suffered or extra costs incurred by the Contractor resulting directly or indirectly from <br />the Award or performance or attempted performance of any other contract or contracts <br />on the Project or caused by a decision or omission of the Engineer respecting the <br />order of precedence in the performance of the contracts. <br />If, through acts of neglect on the part of the Contractor, any others suffer loss or <br />damage on the Work, the Contractor agrees to resolve such loss or damage fairly and <br />expeditiously. If such other shall assert any claim against the City, the Engineer, the <br />City's Representative, or their consultants on account of any damage alleged to have <br />been so sustained, the City shall notify the Contractor, who shall hold harmless, <br />indemnify, and defend the City, Engineer, the City's Representative, and their <br />consultants, and each of their directors, officers, employees, and agents against any <br />such claim, including all attorney's fees and any other costs incurred by the <br />indemnified parties relative to any such claim.