CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-84 <br />Inspection and testing of materials or Equipment in the vicinity of the Work by the <br />City is not practicable, <br />The Contractor requests the City to inspect and test material or Equipment at the <br />point of manufacture, or <br />The Standard Specifications or these Special Provisions require that inspection, <br />testing or witnessing of tests take place at the point of manufacture. <br />1-06.4 Handling and Storing Materials <br />Supplement 1-06.4 by adding the following: <br />Contractor shall store materials and Equipment so as to insure the preservation of their <br />quality and fitness for the Work. Contractor shall store Equipment and materials at <br />location that facilitates inspection. The Contractor shall be responsible for damages, <br />loss or casualty occurring to materials and Equipment until Final Acceptance. <br />1-06.6 Recycled Materials <br />Delete 1-06.6 and its subsections and substitute the following: <br />The Contractor shall make best effort to utilize recycled materials in the construction of <br />the project as detailed in elsewhere in the Standard Specifications and these Special <br />Provisions. <br />Prior to Physical Completion Contractor shall report the quantity of recycled materials <br />utilized in the construction of the project for each of the items listed in Section 9-03.21. <br />Include hot mix asphalt, recycled concrete aggregate, recycled glass, steel furnace <br />slag and other recycled materials (e.g., utilization of on-site material and aggregates <br />from concrete returned to the supplier). Contractor shall provide report on DOT form <br />350-075A Recycled Materials Reporting. <br /> <br />1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC <br />1-07.1 Laws to be Observed <br /> 1-07.1(1) General <br /> Revise 1-07.1(1) by replacing the second sentence of the first paragraph with the <br />following: <br />The Contractor shall indemnify, defend, and save harmless the City (including its agents, <br />officers, and employees) against any claims that may arise because the Contractor (or <br />any employee of the Contractor or Subcontractor or materialperson) violated a legal <br />requirement. <br /> 1-07.1(2) Health and Safety <br />Supplement 1-07.1(2) by adding the following: <br />The Contractor shall be in compliance at all times with all COVID-19 Requirements <br />applicable to the Work. Contractor’s Bid includes all costs necessary for the duration of <br />the Work for compliance with Baseline COVID-19 Requirements.. <br />Supplement 1-07.1by adding the following: <br />1-07.1(6) Additional Requirements <br />The Contractor shall be in compliance with all applicable standards, orders, or <br />requirements issued under Section 306 of the Clean Air Act [42 U.S.C. 1857(h)], <br />Section 508 of the Clean Water Act (33 U.S.C. 1368), Executive Order 11738, and <br />Environmental Protection Agency Regulations (40 CFR Part 15). (Contracts, <br />subcontracts, and subgrants of amounts in excess of $100,000). <br />The Contractor shall comply with mandatory standards and policies relating to energy <br />efficiency that are contained in the state energy conservation plan issued in <br />compliance with the Energy Policy and Conservation Act (Pub. L. 94-163).