My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-85 <br />The City advises all general contractors and subcontractors that numerous Federal, <br />State, and Local regulations exist that could affect the procedures used in the <br />completion of this project. The City advises each prospective Contractor that they are <br />responsible to be aware of and comply with all applicable statutes and regulations. It is <br />recommended that each Contractor contact the local office of the following agencies <br />for a list of applicable regulations and requirements that might affect the <br />implementation of this project: <br />• Federal Environmental Protection Agency <br />• Washington Department of Health <br />• Washington Department of Ecology <br />• Washington Department of Fisheries <br />• Washington Department of Wildlife <br />• Washington Department of Labor & Industries <br />• Puget Sound Air Pollution Control Agency <br />• Municipal Building Department <br />• Municipal Planning Department <br />• Municipal Public Works Department <br />If the scope of Work in this Contract includes Work at the City of Everett Water <br />Filtration Plant or the Waste Water Pollution Control Facility, Contractor shall comply <br />with the requirements of the Washington Department of Labor & Industries for such <br />work including, but not limited to, Chapter 296-67 WAC. All costs associated or <br />incurred in complying with these regulations or any other regulations listed above are <br />included in the Contractor’s Proposal. <br />In cases of conflict between different safety regulations, the more stringent regulation <br />shall apply. <br />The Washington State Department of Labor and Industries shall be the sole and <br />paramount administrative agency responsible for the administration of the provisions of <br />the Washington Industrial Safety and Health Act of 1973 (WISHA). <br />The Contractor shall maintain at the project site office, or other well-known place at the <br />project site, all articles necessary for providing first aid to the injured. The Contractor <br />shall establish, publish, and make known to all employees, procedures for ensuring <br />immediate removal to a hospital, or doctor’s care, persons, including employees, who <br />may have been injured on the project site. Employees should not be permitted to work <br />on the project site before the Contractor has established and made known procedures <br />for removal of injured persons to a hospital or a doctor’s care. <br />The Contractor shall have sole responsibility for the safety, efficiency, and adequacy of <br />the Contractor’s plant, appliances, and methods, and for any damage or injury <br />resulting from their failure, or improper maintenance, use, or operation. The Contractor <br />shall be solely and completely responsible for the conditions of the project site, <br />including safety for all persons and property in the performance of the Work. This <br />requirement shall apply continuously, and not be limited to normal working hours. The <br />required or implied duty of the Engineer to conduct construction review of the <br />Contractor’s performance does not, and shall not, be intended to include review and <br />adequacy of the Contractor’s safety measures in, on, or near the project site. <br />1-07.1(7) Noise <br />Work within 500 feet of residential properties between the hours of 10:00 p.m. and <br />7:00 a.m. during weekdays and between the hours of 6:00 p.m. and 8:00 a.m. on <br />weekends or holidays are subject to noise control requirements if the work generates <br />decibel levels of greater than 55 db(A). Contractor may apply for a Noise Variance a <br />minimum of 30 days prior to performing work and pay $100.00 application fee, using <br />the following link to obtain the latest information on noise variance requirements:
The URL can be used to link to this page
Your browser does not support the video tag.