My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-88 <br />Include all cost incurred for obtaining the CONSTRUCTION STORMWATER <br />GENERAL PERMIT in appropriate bid item or items as no direct <br />compensation will be made. <br />1-07.9 Wages <br />1-07.9(1) General <br />Delete the first paragraph of 1-07.9(1) and substitute the following: <br />This Contract is subject to the minimum wage requirements of RCW 39.12 and to <br />RCW 48.28, as amended or supplemented. Workers shall receive no less than the <br />prevailing rate of wage. Bidder shall use the Washington State Prevailing Wage <br />Rates for Snohomish County, effective at the time of bid opening. Bidder is solely <br />responsible to use the schedule in effect at the Bid Opening Date, determine the <br />appropriate labor classification(s), and use the appropriate and correct prevailing <br />wage and benefit rate(s). The hourly minimum rates for wages and fringe benefits <br />can be obtained at the following URL: <br />https://lni.wa.gov/licensing-permits/public-works-projects/prevailing-wage-rates/ <br />Printed copies of the current prevailing wage rates are available for viewing at City <br />of Everett Public Works, 3200 Cedar St, Everett, WA and the City will mail a hard <br />copy of the prevailing wage rates upon written request received within 7 days of <br />the Bid Opening Date. <br />Delete the fifth paragraph of 1-07.9(1) and substitute the following: <br />If employing labor in a class not listed in the L & I prevailing wage rate schedule, <br />the Contractor shall request a determination of the correct wage and benefits rate <br />for that class and locality from the Industrial Statistician, Washington State <br />Department of Labor and Industries (State L&I), and provide a copy of those <br />determinations to the Project Engineer. <br />Delete the final paragraph of 1-07.9(1) that begins with “There are many work-ready…“ <br />1-07.9(5) Required Documents <br />Supplement 1-07.9(5) by adding the following: <br />The City may require payroll reports for the Contractor and every Subcontractor <br />be submitted weekly to the Construction Division, Public Works Service Center, <br />3200 Cedar Street, Everett, Washington 98201. The payroll reports shall contain <br />the following information: <br />1. Name and residence address of each worker. <br />2. Social Security number of each worker. <br />3. Classification of work performed by each worker. The classification shall <br />be specific and match the classification categories listed in the Contract <br />Documents. <br />4. Total number of hours employed each day. <br />5. Total number of hours employed during the payroll period. <br />6. Straight time and overtime hourly rate of wages paid to each worker. <br />7. Total or gross amount earned by each worker. <br />8. Deductions for Medical Aid, FICA, Federal withholding tax, and any other <br />deductions taken. <br />9. Net amount paid each worker. <br />10. Contractor's, or Subcontractor's, name and address. <br />11. Days and dates worked. <br />12. Date of final day of pay period.
The URL can be used to link to this page
Your browser does not support the video tag.