Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-88 <br />Include all cost incurred for obtaining the CONSTRUCTION STORMWATER <br />GENERAL PERMIT in appropriate bid item or items as no direct <br />compensation will be made. <br />1-07.9 Wages <br />1-07.9(1) General <br />Delete the first paragraph of 1-07.9(1) and substitute the following: <br />This Contract is subject to the minimum wage requirements of RCW 39.12 and to <br />RCW 48.28, as amended or supplemented. Workers shall receive no less than the <br />prevailing rate of wage. Bidder shall use the Washington State Prevailing Wage <br />Rates for Snohomish County, effective at the time of bid opening. Bidder is solely <br />responsible to use the schedule in effect at the Bid Opening Date, determine the <br />appropriate labor classification(s), and use the appropriate and correct prevailing <br />wage and benefit rate(s). The hourly minimum rates for wages and fringe benefits <br />can be obtained at the following URL: <br />https://lni.wa.gov/licensing-permits/public-works-projects/prevailing-wage-rates/ <br />Printed copies of the current prevailing wage rates are available for viewing at City <br />of Everett Public Works, 3200 Cedar St, Everett, WA and the City will mail a hard <br />copy of the prevailing wage rates upon written request received within 7 days of <br />the Bid Opening Date. <br />Delete the fifth paragraph of 1-07.9(1) and substitute the following: <br />If employing labor in a class not listed in the L & I prevailing wage rate schedule, <br />the Contractor shall request a determination of the correct wage and benefits rate <br />for that class and locality from the Industrial Statistician, Washington State <br />Department of Labor and Industries (State L&I), and provide a copy of those <br />determinations to the Project Engineer. <br />Delete the final paragraph of 1-07.9(1) that begins with “There are many work-ready…“ <br />1-07.9(5) Required Documents <br />Supplement 1-07.9(5) by adding the following: <br />The City may require payroll reports for the Contractor and every Subcontractor <br />be submitted weekly to the Construction Division, Public Works Service Center, <br />3200 Cedar Street, Everett, Washington 98201. The payroll reports shall contain <br />the following information: <br />1. Name and residence address of each worker. <br />2. Social Security number of each worker. <br />3. Classification of work performed by each worker. The classification shall <br />be specific and match the classification categories listed in the Contract <br />Documents. <br />4. Total number of hours employed each day. <br />5. Total number of hours employed during the payroll period. <br />6. Straight time and overtime hourly rate of wages paid to each worker. <br />7. Total or gross amount earned by each worker. <br />8. Deductions for Medical Aid, FICA, Federal withholding tax, and any other <br />deductions taken. <br />9. Net amount paid each worker. <br />10. Contractor's, or Subcontractor's, name and address. <br />11. Days and dates worked. <br />12. Date of final day of pay period.