Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-87 <br />power lines become a part of a street or road lighting system; and installing or <br />attaching of any article of tangible personal property in or to real property, whether or <br />not such personal property becomes a part of the realty by virtue of installation. <br />For Work performed in such cases, the Contractor shall collect from the City, retail <br />sales tax on the full Contract price. The City will automatically add this sales tax to <br />each payment to the Contractor. For this reason, the Contractor shall not include the <br />retail sales tax in the unit bid item prices, or in any other Contract amount subject to <br />Rule 170, with the following exception. <br />Exception: The City will not add in sales tax for a payment the Contractor or a <br />Subcontractor makes on the purchase or rental of tools, machinery, equipment, or <br />consumable supplies not integrated into the project. Such sales taxes shall be <br />included in the unit bid item prices or in any other Contract amount. <br />1-07.2(3) Services <br />The Contractor shall not collect retail sales tax from the City on any contract wholly for <br />professional or other services (as defined in Washington State Department of Revenue <br />Rules 138 and 244). <br />1-07.3 Fire Prevention and Merchantable Timber Requirements <br />Delete 1-07.3 in its entirety. <br />1-07.5 Environmental Regulations <br />1-07.5(4) Air Quality <br />Delete all of 1-07.5(4) and substitute the following: <br />The Contractor shall comply with all rules of the Puget Sound Clean Air Agency <br />(PSCAA) (800-552-3565). These rules include PSCAA Regulation I. Excerpts of <br />Regulation I are included in the Appendix D as it relates to fugitive dust control. <br />The Contractor shall submit a dust control plan including dust control measures <br />for its activities related to this Contract that may cause dust. This plan shall be <br />submitted to the Engineer prior to commencing activity at the job site. <br />1-07.6 Permits and Licenses <br />Supplement 1-07.6 by adding the following: <br />A City of Everett business license is required for the Contractor and the <br />Contractor’s Subcontractors prior to commencing construction on this Contract. <br />Contractor shall obtain all necessary permits required by law and the City of <br />Everett. All general building, electrical, plumbing permits will be issued at no cost <br />to the Contractor. In addition, obtain all required permits for waste disposal sites. <br />Waste disposal sites shall be in the United States, unless otherwise expressly <br />stated in the Contract Documents or the City gives prior written approval. <br />This Project has more than one acre of total disturbed area within the project limits <br />and requires coverage under the Construction Stormwater General Permit <br />(CSWGP). The Contractor shall assume responsibility for developing a <br />Construction Stormwater Pollution Prevention Plan (SWPPP) prior to beginning <br />construction, and complying with the requirements of the permit. Criteria and <br />requirements for developing a SWPPP can be found in Volume II of the 2019 <br />Ecology Manual. A link to the Manual can be found on the City’s web site using the <br />following URL: <br />https://www.everettwa.gov/668/Surface-Stormwater <br />Contact Ecology to determine if other requirements apply to the Project. <br />NW Region DOE phone: 425-649-7000