My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-87 <br />power lines become a part of a street or road lighting system; and installing or <br />attaching of any article of tangible personal property in or to real property, whether or <br />not such personal property becomes a part of the realty by virtue of installation. <br />For Work performed in such cases, the Contractor shall collect from the City, retail <br />sales tax on the full Contract price. The City will automatically add this sales tax to <br />each payment to the Contractor. For this reason, the Contractor shall not include the <br />retail sales tax in the unit bid item prices, or in any other Contract amount subject to <br />Rule 170, with the following exception. <br />Exception: The City will not add in sales tax for a payment the Contractor or a <br />Subcontractor makes on the purchase or rental of tools, machinery, equipment, or <br />consumable supplies not integrated into the project. Such sales taxes shall be <br />included in the unit bid item prices or in any other Contract amount. <br />1-07.2(3) Services <br />The Contractor shall not collect retail sales tax from the City on any contract wholly for <br />professional or other services (as defined in Washington State Department of Revenue <br />Rules 138 and 244). <br />1-07.3 Fire Prevention and Merchantable Timber Requirements <br />Delete 1-07.3 in its entirety. <br />1-07.5 Environmental Regulations <br />1-07.5(4) Air Quality <br />Delete all of 1-07.5(4) and substitute the following: <br />The Contractor shall comply with all rules of the Puget Sound Clean Air Agency <br />(PSCAA) (800-552-3565). These rules include PSCAA Regulation I. Excerpts of <br />Regulation I are included in the Appendix D as it relates to fugitive dust control. <br />The Contractor shall submit a dust control plan including dust control measures <br />for its activities related to this Contract that may cause dust. This plan shall be <br />submitted to the Engineer prior to commencing activity at the job site. <br />1-07.6 Permits and Licenses <br />Supplement 1-07.6 by adding the following: <br />A City of Everett business license is required for the Contractor and the <br />Contractor’s Subcontractors prior to commencing construction on this Contract. <br />Contractor shall obtain all necessary permits required by law and the City of <br />Everett. All general building, electrical, plumbing permits will be issued at no cost <br />to the Contractor. In addition, obtain all required permits for waste disposal sites. <br />Waste disposal sites shall be in the United States, unless otherwise expressly <br />stated in the Contract Documents or the City gives prior written approval. <br />This Project has more than one acre of total disturbed area within the project limits <br />and requires coverage under the Construction Stormwater General Permit <br />(CSWGP). The Contractor shall assume responsibility for developing a <br />Construction Stormwater Pollution Prevention Plan (SWPPP) prior to beginning <br />construction, and complying with the requirements of the permit. Criteria and <br />requirements for developing a SWPPP can be found in Volume II of the 2019 <br />Ecology Manual. A link to the Manual can be found on the City’s web site using the <br />following URL: <br />https://www.everettwa.gov/668/Surface-Stormwater <br />Contact Ecology to determine if other requirements apply to the Project. <br />NW Region DOE phone: 425-649-7000
The URL can be used to link to this page
Your browser does not support the video tag.