My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Silver Shield Roofing & Construction, Inc. 5/6/2024
>
Contracts
>
6 Years Then Destroy
>
2024
>
Silver Shield Roofing & Construction, Inc. 5/6/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2024 11:48:15 AM
Creation date
5/6/2024 3:56:52 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Silver Shield Roofing & Construction, Inc.
Approval Date
5/6/2024
End Date
8/16/2024
Department
Procurement
Department Project Manager
Jenny Chang
Subject / Project Title
WFP Gutter Replacement
Tracking Number
0004343
Total Compensation
$20,375.46
Contract Type
Small Works Roster Contracts and Change Orders
Contract Subtype
Small Works Roster Contracts and Change Orders
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Silver Shield Roofing & Construction, Inc. 7/4/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
1 <br /> <br />LIMITED (SMALL WORKS) PUBLIC WORKS CONTRACT #2024-059 <br /> <br />THIS LIMITED (SMALL WORKS) PUBLIC WORKS CONTRACT, which is pursuant to RCW 39.04.155(3), <br />is dated and effective as of the date of last signature below and is by and between the City of Everett, a <br />Washington municipal corporation (the “City”), and the Contractor shown below in the Basic <br />Provisions. <br />1. Basic Provisions: <br />Contractor <br />Silver Shield Roofing & Construction, Inc. <br />PO Box 2338 <br />Lynnwood, WA 98036 <br />silvershieldroofing@gmail.com <br />City Project <br />Manager <br />Douglas Acheson <br />City of Everett – Parks & Facilities <br />3200 Cedar Street <br />Everett, WA 98201 <br />dacheson@everettwa.gov <br />Contract <br />Documents <br />The Contract contains and incorporates the following (the <br />“Contract Documents”): this contract document, all provisions <br />required by law, change orders, and Contractor’s <br />proposal/quotation to the extent such document is attached <br />hereto, in accordance with Section 2.A below. No Contractor- <br />provided document is part of this Contract unless it is attached. <br />Project <br />The Contractor will furnish all labor, tools, materials, equipment, and <br />supplies required to complete all work as set forth in the Contract <br />Documents. The entire work set forth in the Contract Documents is <br />referred to herein as either the “Work” or the “Project.” <br />A brief (and not necessarily complete) description of the Project is <br />follows: Replace selected 6-inch box gutter sections on 6 buildings, as <br />shown on project drawing. <br />Contract Time <br />The Project shall be physically complete in all respects within 120 <br />calendar days from the date of issuance of a Notice to Proceed. <br />The Contractor shall not start the Work until receipt of Notice to <br />Proceed from the City. If a purchase order is issued for the Work, it <br />is only a Notice to Proceed. The purchase order’s pre-printed
The URL can be used to link to this page
Your browser does not support the video tag.