Laserfiche WebLink
CHANGE ORDER # <br />Project (Procurement) Number: Small Works Roster Project Title: <br />LSWR: 2024-059 Water Filtration Plant Gutter Replacement <br />Description of Change: (Attach contractor change proposal and cost schedule) (Attach Price or Cost Analysis) <br />BUILDING/LOCATION: 6133 Lake Chaplain Road, Monroe, WA 98272 <br />This change order replaces Filtration Plant Aluminum Poly Building. <br />During the initial inspection by city staff of the Aluminum Poly Building, the awning extending over the <br />stair landing was identified as the source of a water leak. Staff obtained quotes from qualified <br />suppliers to correct the leaking awning. <br />After the contract was awarded and the contractor completed repairs on the aluminum poly building <br />awning, water continued to leak from the building. Upon further investigation, the contractor identified <br />the upper gutter section of the building as the actual source of the water leak. <br />After bringing this to the attention of City staff, it was determined that in order to correct the leak <br />completely, the upper gutter section also needed to be replaced. <br />The changes described above result in the following adjustment(s) in price and contract time (in calendar days). <br />* Total Project Price Before this Change $20,375.46 Contract Time & Completion Date Prior <br />to This Change 120 <br />Completion Date <br />Prior <br />09/03/2024 <br />* Net (Increase) or (Decrease) Resulting <br />from this Change++$2,224.25 Net (Increase) or (Decrease) Resulting <br />from this Change 0 <br />* Total Project Price, Including this <br />Change $22,599.71 Contract Time & Completion Date <br />Including This Change 120 <br />Completion Date <br />After <br />09/03/2024 <br />By signing below, the City of Everett and the Contractor agree that the Contract work shall be changed to the extent <br />described in <br />for all such changes, including all direct and indirect costs and impacts. The City of Everett and the Contractor further agree <br />that Contract time shall be adjusted to the extent shown above. This Change Order only changes the contract between the <br />City of Everett and the Contractor to the extent explicitly provided in this Change Order. Signatures on this change order <br />may be ink, scanned pdf signature, or other electronic means. <br />CONTRACTOR CITY OF EVERETT <br />Silver Shield Roofing & Construction, Inc. <br />PO Box 2338 <br />Lynwood, WA 98036 <br />City of Everett <br />3200 Cedar Street <br />Everett, WA 98201 Date <br />Project Manager:Doug Acheson <br />Division Manager:Russell Dance <br />Department Director:Bob Leonard <br />Name & Title:Lesa Simmons, President City Attorney Template Approved as to Form 10.17.22 <br />Date:Mayor:Cassie Franklin <br />*WA Use Tax on materials included. WAC 458-20-171 <br />0001 <br />07/03/2024 07/04/2024 <br />Attest: