My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering, Inc 5/7/2024
>
Contracts
>
6 Years Then Destroy
>
2025
>
HDR Engineering, Inc 5/7/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:10:21 AM
Creation date
5/7/2024 10:51:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering, Inc
Approval Date
5/7/2024
Council Approval Date
5/1/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lexington-Broadway Stormwater Improvements-Phase 1
Tracking Number
0004344
Total Compensation
$877,460.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
HDR Engineering, Inc. 8/25/2025 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Lexington-Broadway Stormwater Imp. Phase 1 5 Scope of Services <br />City Responsibilities <br />The City is responsible for the following activities: <br />1. Review additional survey request(s) from the Consultant. <br />2. Provide rights of entry to parcels, as requested. <br />3. Review and process contract change requests and amendments, if needed <br />Assumptions <br />The following was assumed for this task: <br />1. Existing survey from the preliminary design phase may be used in support of final design <br />development. <br />2. Utility pothole depths assume that the utility will be between 0 and 12 feet in depth. <br />3. Up to a maximum of six potholes may be required. <br />4. Sand and gravel backfill, and permanent hot-mix asphalt repair are required for all test <br />holes. <br />5. Services under this task are contingent in nature. The specific scope of services, estimated <br />labor, and associated expenses are to be negotiated in advance and agreed upon by both <br />the City and the Consultant prior to NTP. <br />Deliverables <br />The following deliverables will be produced: <br />1. Request for additional survey and utility locates, if required (email) <br />2. Pothole measurement field notes (email or PDF) <br />3. Topographic survey and AutoCAD (Digital Terrain Model [DTM]) files <br />Task 300 Geotechnical Investigation <br />Objective <br />The task objective is to provide geotechnical evaluation to support the Phase 1 project design. <br />HWA GeoSciences, Inc. (HWA) is being retained to perform these services. <br />Consultant Services <br />The Consultant will provide the following services: <br />1. Develop and coordinate a field exploration plan for drilling of up to three geotechnical <br />borings in support of evaluating subgrade soil and groundwater conditions within the vicinity <br />of the proposed treatment facility, retaining walls, flow split vault, and soil conditions near <br />the intersection of 3rd Street and Lenora Street. Locations for these explorations will be <br />based on the provided plans for the proposed improvements. The exploration plan will detail <br />the type, location, and extent of proposed field explorations along with logistics necessary to
The URL can be used to link to this page
Your browser does not support the video tag.