My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering, Inc 5/7/2024
>
Contracts
>
6 Years Then Destroy
>
2025
>
HDR Engineering, Inc 5/7/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:10:21 AM
Creation date
5/7/2024 10:51:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering, Inc
Approval Date
5/7/2024
Council Approval Date
5/1/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lexington-Broadway Stormwater Improvements-Phase 1
Tracking Number
0004344
Total Compensation
$877,460.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
HDR Engineering, Inc. 8/25/2025 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Lexington-Broadway Stormwater Imp. Phase 1 11 Scope of Services <br />Consultant Services <br />The Consultant will provide the following services: <br />1. Prepare a draft and final Archaeological Resources IDP for inclusion in construction bid <br />documents. The construction IDP will be prepared meeting the Revised Code of Washington <br />(RCW) and Executive Order (EO) 21-02. <br />2. Update the existing geotechnical boring IDP for use under Task 300 services. <br />3. Prepare the Ecology Cultural Resources Review Form to support State Environmental <br />Policy Act (SEPA) review. <br />City Responsibilities <br />The City is responsible for the following activities: <br />1. Provide written consolidated, conflict-resolved comments for the updated geotechnical <br />monitoring IDP and construction IDP. <br />Assumptions <br />The following was assumed for this task: <br />1. Draft construction IDP and draft Ecology Cultural Resources Review Form will be prepared <br />based on draft 90% design. <br />2. Geotechnical monitoring IDP will be updated for the three new borings. <br />A. IDP and cultural review form will be reviewed and approved by Ecology. Resulting <br />consultation will be led by Ecology. <br />3. Only one round of edits will be required to draft documents. No edits will be required to final <br />documents. <br />Deliverables <br />The following deliverables will be produced: <br />1. Draft and final construction IDP (PDF) <br />2. Draft and final updated geotechnical monitoring IDP (PDF) <br />3. Draft and final Ecology Cultural Resources Review Form <br />Task 500 Project Reports <br />Objective <br />The task objective is to prepare a design report update to document the project stormwater <br />infrastructure and treatment facility design and to document facility operations and maintenance <br />(O&M) recommendations.
The URL can be used to link to this page
Your browser does not support the video tag.