My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering, Inc 5/7/2024
>
Contracts
>
6 Years Then Destroy
>
2025
>
HDR Engineering, Inc 5/7/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:10:21 AM
Creation date
5/7/2024 10:51:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering, Inc
Approval Date
5/7/2024
Council Approval Date
5/1/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lexington-Broadway Stormwater Improvements-Phase 1
Tracking Number
0004344
Total Compensation
$877,460.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
HDR Engineering, Inc. 8/25/2025 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Lexington-Broadway Stormwater Imp. Phase 1 19 Scope of Services <br />following receipt of the 90 percent design review. Technical review meetings will require 1 <br />hour each for preparation and follow-up for each Consultant attendee. <br />Deliverables <br />The following deliverables will be produced: <br />1. Agenda and meeting notes (Word or PDF). <br />Subtask 720 Final Design Services <br />Consultant Services <br />The Consultant will provide the following services: <br />1. Stormwater system design including the following: <br />A. Prepare a Construction Stormwater Pollution Prevention Plan (CSWPPP) based on <br />SWMMWW guidelines. <br />2. Prepare draft final and final design drawings and contract documents that include the <br />following: <br />A. General, demolition, civil, storm, and water. <br />B. Electrical power service and site lighting. <br />C. Structural design. <br />D. Traffic signing and striping (replacement and restoration) and temporary traffic control <br />related specifications. <br />3. Prepare Engineer’s OPCC (AACE Class 1) based on the itemized bidders list. <br />City Responsibilities <br />The City is responsible for the following activities: <br />1. Provide reviews with one set of consolidated (conflict-resolved) comments on the draft final <br />milestone submittal package and CSWPPP within 15 business days of receiving draft <br />submittal documents. <br />2. Provide current City of Everett GSP template, contract inserts, and non-technical <br />appendices (wage rates) inserts. <br />3. The City will complete and manage the advertising, bidding, and procurement process. <br />Assumptions <br />The following was assumed for this task: <br />1. The conveyance and water quality treatment facility hydrologic modeling prepared with the <br />Lexington-Broadway Stormwater Improvements preliminary design may be used without <br />significant revisions.
The URL can be used to link to this page
Your browser does not support the video tag.