My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering, Inc 5/7/2024
>
Contracts
>
6 Years Then Destroy
>
2025
>
HDR Engineering, Inc 5/7/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:10:21 AM
Creation date
5/7/2024 10:51:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering, Inc
Approval Date
5/7/2024
Council Approval Date
5/1/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lexington-Broadway Stormwater Improvements-Phase 1
Tracking Number
0004344
Total Compensation
$877,460.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
HDR Engineering, Inc. 8/25/2025 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Lexington-Broadway Stormwater Imp. Phase 1 21 Scope of Services <br />Task 800 Bid Phase Support <br />Consultant Services <br />Bid phase support services are not included in the scope at this time. <br />Task 900 Design Support during Construction <br />Consultant Services <br />Construction support services are not included in the scope at this time. <br />Task 1000 Permitting <br />Background <br />Project preliminary design was completed in August 2023 and the work included preparation of <br />natural-resources documentation and draft environmental permit application materials in support <br />of the conveyance system upgrades, stormwater treatment facility, and new discharge outfall to <br />the Snohomish River, located in Lowell Riverfront Park. <br />Final design of Lexington-Broadway stormwater conveyance between the BNSF crossing and <br />east to the discharge outfall is planned with Phase 2 design in a future contract. The purpose of <br />this task is to prepare, submit, and coordinate environmental permits in support of Phases 1 and <br />2 of the project. <br />Objective <br />Phase 1 and select Phase 2 permit applications and supporting environmental documentation <br />will be completed as part of this contract. The jurisdictions anticipated to require permits or <br />approvals for the project include the City, Ecology, Washington State Department of Natural <br />Resources (DNR), and the United States Army Corps of Engineers (USACE). <br />Consultant Services <br />The Consultant will provide the following services: <br />1. Incorporate City comments, finalize, and submit environmental documents and permit <br />application materials that were drafted during preliminary design in 2023: <br />A. Critical Areas Report (CAR). <br />B. Biological Assessment (BA). <br />C. Shoreline Code Analysis technical memorandum. <br />D. SEPA checklist. <br />E. Joint Aquatic Resources Permit Application (JARPA) to be submitted to USACE for <br />Section 10 and Section 404 permit, and Ecology for Section 401 Water Quality <br />Certification (WQC). JARPA Attachment E will also be submitted to DNR for the Aquatic <br />Lands Use Lease.
The URL can be used to link to this page
Your browser does not support the video tag.