Laserfiche WebLink
Lexington-Broadway Stormwater Imp. Phase 1 24 Scope of Services <br />1. Final CAR, BA, and Shoreline Code Analysis technical memorandum, following City review <br />(in electronic PDF and Word formats) <br />2.Final SEPA checklist, following City review (in electronic PDF and Word formats) <br />3.Final JARPA, following City review (in electronic PDF and Word formats) <br />4.Draft and final Ecology Section 401 pre-filing request and 401 WQC request forms (in <br />electronic PDF and Word formats) <br />5.Draft and final City permit application materials for Phase 1 construction (in electronic PDF <br />formats, and Word format as applicable) <br />6.Draft and final Stormwater Construction General Permit Application for Phase 1 (in <br />electronic PDF and Word formats) <br />7.Draft and final City permit application materials for Phase 2 construction (in electronic PDF <br />formats, and Word format as applicable) <br />8.USACE application for pre-application meeting