My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering, Inc 5/7/2024
>
Contracts
>
6 Years Then Destroy
>
2025
>
HDR Engineering, Inc 5/7/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:10:21 AM
Creation date
5/7/2024 10:51:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering, Inc
Approval Date
5/7/2024
Council Approval Date
5/1/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lexington-Broadway Stormwater Improvements-Phase 1
Tracking Number
0004344
Total Compensation
$877,460.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
HDR Engineering, Inc. 8/25/2025 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Lexington-Broadway Stormwater Imp. Phase 1 23 Scope of Services <br />1. Provide applicable real estate and legal description information. <br />2. Sign permit forms, as necessary, and authorize the Consultant to act as the applicant’s <br />agent for permit submittals and reviews. <br />3. Fees, public notices, generation of mailing lists, and distribution required by the reviewing <br />agencies. <br />Assumptions <br />The following was assumed for this task: <br />1. The JARPA, BA, CAR, and SEPA checklist were based on 30 percent design developed in <br />the original contract. These documents will be updated based on comments received from <br />the City during their initial review as well as any amendments to design for the Phase 1 <br />elements completed under Task 700 of this scope of services. Finalization of Phase 1 has <br />no bearing on finalization of Phase 2 design; these documents will continue to address <br />phase 2 elements at the 30 percent design level, and it is assumed that level of design is <br />adequate for agencies to begin their review of the overall project. <br />2. The JARPA is not needed to permit or construct Phase 1 but will address Phase 1 project <br />elements as necessary to fully describe the need for and design of the Phase 2 treated <br />stormwater discharge pipe and outfall. <br />3. The Consultant will complete one round of edits to state and federal permit application <br />materials and natural resource documents based on client comments. Additional support <br />may be provided subject to a change order. <br />4. The Consultant will prepare final electronic deliverables upon receipt of one set of <br />consolidated comments on the draft versions from the City. <br />5. The Consultant will submit application materials to online portals. <br />6. City of Everett Public Works permits for Phases 1 and 2 are assumed not to be needed <br />based on June 2023 pre-application comments on the project. <br />7. The WDFW Hydraulic Project Approval, DNR state-owned aquatic lands use lease <br />application packages, and National Pollutant Discharge Elimination System (NPDES) NOI <br />for Phase 2 work will be submitted in the Phase 2 design contract. <br />8. Permit acquisition will start under this scope of services, but it is anticipated that Phase 2 <br />permits will not be fully issued until the Phase 2 design contract. The Consultant will, <br />however, facilitate timely response to agency comments and RFIs made on applications <br />submitted under this scope of services. <br />9. It is assumed that the Lexington-Broadway Stormwater Improvements Preliminary design <br />site plans within the Phase 2 area will be accepted and may be used without change or <br />updates for the Phase 2 permit applications. <br />Deliverables <br />The following deliverables will be produced:
The URL can be used to link to this page
Your browser does not support the video tag.