Laserfiche WebLink
—ink <br /> Yin Lu <br /> From: Francisco Garcia <garciaf@empireconstructioninc.com> <br /> Sent: Wednesday, September 6, 2023 8:32 AM <br /> To: Yin Lu <br /> Subject: Re: [EXTERNAL] Re: B2306-058 -few questions <br /> Good morning Yin, <br /> I have the questions answered. Please let me know if you have any other questions. <br /> Thank you! <br /> We'd like to double check is the 4" concrete slab at courtyard existing or new? It shows as new in proposed main floor <br /> plan Iexisting in sections and callouts on A5 <br /> The courtyard is the existing one however we added self leveling over it, which makes it look newer. <br /> 1. From the proposed main floor plan, it looks like there is only one new wall at south end. However, in <br /> the shear wall schedule,there are 4 shear walls. Could you identify each of them on plan and let us <br /> I know which is applicable in this project? <br /> Only 1 n w wall. I have attached a picture to show this. <br /> , On 2/S3.1 roof gable end extend 1'6" but on the architectural roof plan, there is no extension at gable <br /> end. Which design is preferred? <br /> "The architectural should show some overhang at gable end."Answer we got from architect <br /> was not able to find where 1/S3.1 refer to, could you help me with it? <br /> "1/S3.1 should refer to the situation where trusses are sitting on walls but no tails. my mark up was"1/S3.1 SIM"" <br /> answer we received from architect T', . 014iC� on by ‘ du- <br /> ,/1/S3.2(framing) is a typical stair riser and landing detail, does it mean you will demo entry stair and <br /> rebuild one? <br /> Weconstructed same layout <br /> 1. It looks like you are not demo any of the existing roof structure at north end? Please correct me if I'm <br /> wrong. If so,you may need to provide a detail to show how the new structure connect to existing <br /> structure <br /> We are not demoing anything <br /> 1 <br />