Laserfiche WebLink
• • <br /> Response#8: <br /> All type A units (units 203, 303) to remian the same. See sheet A-0.1 for accessible units <br /> analysis. <br /> Energy <br /> 9. Correction#9: <br /> The proposed project includes modifications to the exterior envelope of the building. Thermal <br /> performance ratings should be specified for each type of component. See WSEC Section C503.1. <br /> Response#9: <br /> See sheet A-1.1 for wall type W-1 indicating R-21 batt insulation. <br /> Structural <br /> General <br /> 1. Correction#1: <br /> The project includes modifications to the structural systems. Structural drawings sealed and <br /> signed by a professional engineer licensed in the state of Washington are required. See IBC <br /> Section 107.1 and RCW 18.43. <br /> Response#1: <br /> See sheet A-1.1 for shear wall SW2 schedule and holddowns. <br /> Foundations: <br /> 2. Correction#2: <br /> The proposed project includes modifications that may require the construction of new <br /> foundations. A foundation plan may be required. Calculations substantiating the new <br /> foundations should be submitted for review. See IBC Sections 107.2.1, 1603.1, 1604.1, and <br /> 1604.4. <br /> Response#2: <br /> See sheet A-1.1 for shear wall SW2 schedule and holddowns. <br /> Gravity System: <br /> 3. Correction#3: <br /> The proposed project includes walls that are load bearing. Structural framing plans are <br /> required. Calculations substantiating the modifications to the load path should be submitted <br /> for review. See IBC Sections 107.2.1 1603.1 1604.1 and 1604.4. <br /> Response#3: <br /> See sheet A-1.1 for shear wall SW2 schedule and holddowns. <br /> Lateral System: <br /> 4. Correction#4: <br /> The proposed project includes demolition of a lateral shear wall. Note that this wall also serves <br /> as a load-bearing wall for the stories above. Structural framing plans are required. <br /> Calculations substantiating the redistributed loads to the remaining lateral system should be <br /> submitted for review. See IBC Sections 107.2.1, 1603.1, 1604.1, 1604.4,and 1613.1. <br /> Response#4: <br /> See sheet A-1.1 for shear wall SW2 schedule and holddowns. <br /> '3JLI <br />