My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5801 S 2ND AVE 2022 Plans 2024-05-24
>
Address Records
>
S 2ND AVE
>
5801
>
Plans
>
5801 S 2ND AVE 2022 Plans 2024-05-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 1:41:29 PM
Creation date
5/16/2024 1:14:40 PM
Metadata
Fields
Template:
Address Document
Street Name
S 2ND AVE
Street Number
5801
Permit
B2201-024
Year
2022
Notes
CONSTRUCT NEW ADDITIONAL DWELLING UNIT
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Address: <br />5601 5 2nd Ave, Everett, Y*tA %208 <br />Rnnlicant/Owner: <br />Yuriy Ilchuk <br />Legal Description* <br />SEC 05 TNP 28 RGE 05RT-5E <br />Tax ID: <br />280505-001-014-00 <br />Parking Calculations: <br /># of spaces required = 3 <br /># of spaces existing = 3 <br />Height Calculations: <br />A = 85.6' <br />B = 84.15' <br />G = 81.25' <br />+ D=82.q' <br />= 326.5' / 4 <br />= 83.625' Average Base Elevation <br />+ 24' Allowed <br />10-1.625' Max Height Ml <br />�l <br />Lot Coverage BU Buildings: <br />Ml <br />3� <br />Lot Size = 55,254 SF <br />E <br />Existing Structure: 2,532 5F <br />�01 <br />Proposed Structure: 997 SF <br />Total: = 3,529 SF <br />% Lot Covered By Buildings = <br />3,521 SF / 35,254 X 100% = q.43% <br />Quantified Surface Areas: <br />Total Proposed Roof 5F = 1360 5F <br />Total Land -Disturbing Activity = 1190 E <br />Legend: <br />Grading limits - - <br />Vgater line — — — <br />Sewer line — Storm water -— — — — — — — <br />Bench Mark Elevation 100' <br />52ndAve <br />N <br />12' <br />I L <br />N <br />S � <br />.L m 63 <br />� 63 <br />N <br />+, �X <br />1121 .X <br />LU osed 3/4" Nater Line <br />50' <br />50' 1 Existing Structure <br />10' <br />Proposed Roof drainage <br />10 <br />50 <br />30' <br />D=829' <br />/tK <br />—/MCP <br />Q.�O <br />Clearih <br />9 limits <br />silt fence <br />Construction <br />Access <br />Sewer Line -An' <br />Sewer Easement <br />ill <br />1 st Floor <br />15' <br />in <br />u <br />5NFPP <br />Element 1: Mark clearin lia mitt <br />Clearing limits shown on site plan. <br />Temporary construction access to <br />be placed at the north west corner of the lot. <br />All vehicles to be free of debris prior to leaving site. <br />Element Be Control Flow Rates <br />Flow rates during construction are to be contained using a <br />silt fence installed at the east side of the proposed dwelling. <br />Element 4: Install Sediment Controls <br />Sediment controls consist of installing silt fence on the east side <br />of the proposed dwelling. <br />Element 5: Stabilize soils <br />All soils disturbed during site grading will be stabilized using the most appropriate <br />BMPs. Short term BMPs include covering temp stockpile or compaction. Long term <br />BPMs include covering disturbed soils in mulch or hydroseeding. <br />Element 6: Protect Slopes <br />No steep slops within clearing limits. <br />Element I Protect Drain Inlets <br />Drain inlets will be protected with catch basin inserts or equivalent. <br />Element 8: Stabilize channels and outlets <br />Channels and outlets are not needed around the proposed development. <br />200No stabilization necessary. <br />Element Cl: Control Pollutants <br />All pollutants from construction vehicles will be contained and disposed of <br />in the approved manner consistent with state environmental policies. All pollutants <br />will be disposed off -site at approved facilities. <br />Element 10: Control De -watering <br />De -watering of site not expected. <br />Element 11: Maintain BMPs <br />All TESG devices will be inspected and maintianed on a weekly basis or <br />as needed. kNhen construction is complete and the site is stabilized, any <br />remaining sediment will be removed and stabilized on -site. <br />Element 12: Manage the project <br />Owners will be the general construction managers on -site. General <br />manager will maintain all above items to minimize sediment transport and <br />turbid water leaving the site. kNill entail continual observation of the grading <br />operations to ensure minimal effects to adjacent properties and off -site <br />waterways. <br />Element 15: Protect on -site Stormwater BMPs <br />Amended areas will be protected from compaction and sedimentation <br />when feasible during construction. <br />w <br />Q <br />0 <br />m <br />Z <br />0 <br />a <br />U <br />w <br />0 <br />Z <br />U <br />W <br />4_ <br />J <br />w <br />C <br />rp <br />w J'� <br />V/ <br />w <br />U) <br />Q <br />Q <br />.. N <br />Z <br />o U) <br />a <br />U O <br />W ()0w <br />o U) <br />LLI <br />0 <br />a <br />m <br />0 <br />w <br />0 <br />0 <br />a <br />cD <br />Z <br />Q <br />0 <br />DATE: <br />12/21 /2021 <br />SCALE: <br />.25" = 4' <br />SHEET: <br />A-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.