My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO Construction 5/21/2024 Amendment 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO Construction 5/21/2024 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2024 2:02:11 PM
Creation date
5/21/2024 2:01:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO Construction
Approval Date
5/21/2024
Council Approval Date
5/8/2024
End Date
4/30/2026
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Capital Improvements at the Water Filtration Plant
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
1 <br />CITY OF <br />EVERETT <br />Water Filter Plant – Phase 2 Capital Upgrades GMP Amendment to Progressive Design-Build Contract Between Owner and Design-Builder <br />OWNER: <br />City of Everett <br />3200 Cedar Street <br />Everett, Washington 98201 <br />DESIGN-BUILDER: <br />IMCO General Construction, Inc. <br />2116 Buchanan Loop <br />Ferndale, WA 98248 <br />PROJECT: <br />City of Everett Water Filter Plant – Phase 2 Capital Upgrades
The URL can be used to link to this page
Your browser does not support the video tag.