My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO Construction 5/21/2024 Amendment 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO Construction 5/21/2024 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2024 2:02:11 PM
Creation date
5/21/2024 2:01:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO Construction
Approval Date
5/21/2024
Council Approval Date
5/8/2024
End Date
4/30/2026
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Capital Improvements at the Water Filtration Plant
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />2 <br /> <br />The Owner and Design-Builder hereby amend the Progressive Design-Build Contract (the <br />“Contract”) dated May 9, 2023, to establish a Guaranteed Maximum Price and other terms and conditions <br />of the Contract. This Guaranteed Maximum Price Amendment (“GMP Amendment”) is made as of date <br />of last signature below. <br /> <br />Section A: Guaranteed Maximum Price <br />A.1 Guaranteed Maximum Price. As agreed by the Owner and Design-Builder, the Contract Price for <br />Phase 2 Services shall not exceed Twenty-Five Million Seven Hundred Seven Thousand Four Hundred <br />Twenty and 86/100 Dollars ($25,707,420.86), exclusive of Washington state sales tax, subject to additions <br />and deductions by Change Order as provided in the Design-Build Documents. <br />A.2 Agreed Phase 2 Proposal. The Guaranteed Maximum Price is based on Design-Builder’s Phase 2 <br />Proposal, as agreed to by the Owner, and the scope of Phase 2 Work identified therein. A complete copy <br />of the agreed Phase 2 Proposal is maintained by the City of Everett Clerk’s Office as a single pdf and is <br />available as follows (“Agreed Phase 2 Proposal”): <br />Link to Agreed <br />Phase 2 Proposal <br />PDF <br />https://lfportal.everettwa.gov/WebLink/DocView.aspx?id=1695105&searchid=b2172133- <br />0a6f-4850-9628-2be3f0055501&dbid=0 <br /> <br />Per City of Everett City Charter Section 4.12, the City Clerk does not have authority to <br />execute contracts on behalf of the City of Everett. The Clerk’s digital signature on page <br />one of the linked pdf is in the Clerk’s role as custodian of official city records and is solely <br />a digital certification intended to create a pdf secure for long-term electronic storage. <br />Design-Builder acknowledges that Design-Builder has downloaded and reviewed this pdf prior to signing <br />this GMP Amendment. Owner and Design-Builder agree that this pdf contains the complete Agreed <br />Phase 2 Proposal and that it is hereby incorporated into this GMP Amendment. <br />A.3 Elements of the Agreed Phase 2 Proposal. Section 2.3.1 and Exhibit C (Task 7) of the Contract <br />contains a listing of the intended elements of the Phase 2 Proposal. The following table is a roadmap to <br />the Agreed Phase 2 Proposal. Each item has been bookmarked within the Agreed Phase 2 pdf. <br />[roadmap table begins on next page]
The URL can be used to link to this page
Your browser does not support the video tag.